合同编号:______科技合字( )第______号
项目名称:________________________________________
技术受让方:(公章)______________________________
(甲方)
技术转让方:(公章)______________________________
(乙方)
中介方:(公章)__________________________________
合同登记机关:(公章)____________________________
签订日期:__________年______月______日
合同履行期限:______年______月______日至______年______月______日
一、发明创造名称和内容
___________________________________________________________________________
二、实施许可的范围、期限和方式
___________________________________________________________________________
三、技术情报和资料及其保密事项
___________________________________________________________________________
四、技术服务的内容
___________________________________________________________________________
五、履行合同的计划、进度、期限、地点和方式
___________________________________________________________________________
六、验收的标准和方法
___________________________________________________________________________
七、成交金额与付款时间、付款方式
一次总付:________________________________
分次总付:________________________________
按利润或销售额提成________% 时间:____________________
其它方式:________________________________________________
八、中介方的义务和责任及收取中介服务费比例和支付方式
___________________________________________________________________________
九、后续改进的提供与分享
___________________________________________________________________________
十、违约责任
___________________________________________________________________________
十一、争议的解决办法
___________________________________________________________________________
十二、名词和术语的解释
___________________________________________________________________________
〔说明〕
1.“合同类型”一项要写明专利实施许可合同,并注明是普通实施许可合同、排他实施许可合同或者独占实施许可合同。
普通实施许可合同是最常见的专利实施许可方式。指转让方许可受让方在一定范围内实施转让方所有或者持有的专利所订立的合同。
排他实施许可合同,是转让方和受让方约定分享专利实施权的协议。转让方不得在已许可受让方实施专利的范围内,就该项专利与第三方订立专利实施许可合同,但可以保留实施该项专利的权利。
独占实施许可合同,是转让方将专利实施权移交受让方所订立的协议。转让方不得在已许可受让方实施专利的范围内,就该项专利与第三方订立专利实施许可合同,自己也不得实施该项专利。
2.在“实施许可的范围、期限和方式”一项,如果转让方许可受让方向第三方分售专利实施许可时,应约定分售的条件及有关事项。没有约定时,应视为受让方在整个的专利权存续期间实施专利,不受地区和方式的,但不得与第三方订立专利实施许可合同。
3.“技术服务项目”一项,指转让方派出专业技术人员进行技术指导的项目、内容、工作期限和有关事项。
4.“后续改进的成果分享”一项应规定在合同成立以后,双方在原有专利基础上加以改进所完成的新的技术成果是否向对方提供,以及如何互惠使用。
合同号:____________
甲方: (中方)_______________________________
法定地址:__________________________________
乙方: (外方)_______________________________
法定地址:__________________________________
合同签约日:________________________________
合同签约地:________________________________
前 言
鉴于乙方拥有技术,并有能力制造合同设备,乙方有权利并愿意许可给甲方;
鉴于甲方愿意从乙方获得制造合同设备的技术及合同设备。
为此,双方在协商一致的基础上,同意按如下条款签订本合同。
第一章 定 义
1.1. 合同产品指本合同附件一中所列的全部产品。
1.2. 技术资料:包括专利申请文件及实施与该专利有关的(产品设计图纸、工艺图纸、工艺配方、工 艺流程以 及制造合同产品所需的工装、设备清单等)技术资料。
1.3. 蓝图指乙方制造合同产品目前所使用的总图、制造图钎、材料规范及零件目录等的复制件。
1.4. 标准指为制造合同产品向甲方提供的技术资料中,由乙方采用和制定的标难。
1.5. “净销售额”是指产品的市场销售价扣除包装费、保险费、仓储费、运输费、商业折扣、各种税 收等费用及扣除供方提供的零部件价格。
1.6. 合同有效期指本合同开始生效的时间到本合同14.3条规定的本合同终止时间的期间。
第二章 合同内容
2.1. 乙方同意向甲方提供制造———合同产品的书面及非书面专有技术。用该项技术所生产的合同产品的品种、规格、技术性能等详见本合同附件一(略)。
2.2. 乙方负责向甲方提供制造、使用和销售合同产品的专有技术和其他所有有关技术资料。技术资料的内容及有关事项详见本合同附件二(略)。
2.3. 乙方负责安排甲方技术人员在乙方工厂进行培训,乙方应采取有效措施使甲方人员掌握制造合同产品的技术。具体内容见本合同附件三(略)。
2.4. 乙方派称职的技术人员赴甲方合同工厂进行技术服务。具体要求详见本合同附件四(略)。
2.5. 乙方同意在甲方需要时,以最优惠的价格向甲方提供合同产品的备件。届时双方另签协议。
2.6. 乙方有责任对本合同项目甲方需要的关键设备提供有关咨询。
2.7. 乙方应向甲方提供合同产品的样机、铸件和备件,具体内存详见本合同附件五(略)。
2.8. 甲方销售合同产品和使用乙方商标的规定,见本合同第八章。
第三章 价 格
3.1. 按本合同第一章规定的内容,甲方向乙方支付的合同费用规定如下:
3.1.1. 入门费为_________(币种)(大写)这是指合同产品有关的资料转让费和技术培训费,包括技术 资料在交付时的一切费用,入门费为固定价格。
3.1.2. 合同产品考核验收合格后,甲方每销售一台合同产品的提成费为净销售额的——%。
第四章 支付和支付条件
4.1. 本合同项下的一切费用,甲方和乙方均以________(币种)支付。甲方支付给乙方的款项应通过中 国____银行和______国银行办理。如果乙方向甲方偿还金额,则此款项应通过_______银行印中国_______银行办理。 所有发生在中国银行的费用,由甲方负担,发生在中国以外的银行费用由乙方负担。
4.2. 本合同第三章规定的合同费用,甲方按下列办法和时间向乙方支付:
4.2.1. 甲方收到下列单据,并审查无误后______天内向乙方支付入门费______(币种)(大写)。
(a)由乙方出具的保证函。在乙方不能按照合同规定交付技术资料时,保证偿还______(币种)。
(b)即期汇票正、副本各一份。
(c)应支付金额为入门费总价的形式正本一份,副本三份。
(d)乙方出具的第一阶段产品的技术资料、样机、铸件和备件交付完毕的证明信正、副本各一份。
4.2.2. 甲方收到乙方交付第二阶段产品的下列单据,并审查无误后_________天内向乙方支付________美 元(大写)。
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
(c)空运提单正本一份,副本三份。
(d)乙方出具的第二阶段产品技术资料、样机、附件五规定的________己交付完毕的证明信正、副本各一份。
4.2.3. 合同产品第一批样机验收合格后,甲方收到乙方下列数据,并审查无误后______天内,向乙方支付________美元(大写)。
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
(c)双方签署的“合同产品考核验收合格证书”影印本一份。 注:如果验收试验延迟并是甲方的责任,将不迟于合同生效后(时间)支付。
4.3. 本合同第三章规定的提成费,甲方将在抽样产品考核验收合格后按下述办法和条件向乙方支付。
4.3.1. 甲方在每日历年度结束后________天内,向乙方提交一份甲方在上一日历年度的每种型号的产品 实际销售量的报告。
4.3.2. 乙方每年可派代表到合同工厂检查和核实甲方合同产品实际销售量的报告,甲方将给予协助。 乙方来华费用由乙方负担。如果汇总和或报告中所列的合同产品数量在检查时发现出入很大,则甲乙双方应 讨论此差距并洽商采取的正确的措施。
4.3.3. 甲方收到乙方下列单据,并审查无误后_______天内向乙方支付提成费:
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
本合同于_________年_________月_________日在_________签订。
一方为_________,以下简称甲方。
一方为_________,以下简称乙方。
鉴于乙方拥有合同产品生产的专有技术,并有权和愿意向_________公司转让该项技术。
鉴于_________公司希望利用乙方所拥有的专有技术,以生产销售和出口合同产品。
甲方受_________公司委托,由甲方同乙方经过友好协商,同意按下列条件及条款签订本专有技术合同。本合同由_________公司与乙方执行。
第一条 定义
1.1 专有技术,原指生产合同产品,甲方所需要的乙方所拥有和提供的全部生产技术及加工工艺。该生产技术和加工工艺包括全部设计、制造、操作图纸及技术资料、制造工艺、生产程序和生产技术细节。
1.3 技术资料,指制造合同产品所需要的全部“专有技术”,以及乙方在生产合同产品的过程中,所使用的全部有关设计和制造图纸,加工技术和工艺文件等资料。具体内容及要求详见本合同附件二。
1.4 考核产品,指甲方用乙方提供的专有技术和专用设备所生产和制造的合同产品。该产品经过验证符合并且达到本合同附件一所规定的技术条件和技术标准。
1.5 工艺文件,指生产合同产品所需要的全部加工方法、加工手段、工艺过程卡片、工艺图纸、工序卡片等全套资料。具体内容详见本合同附件二。
1.6 工艺守则,指生产合同产品的全部生产和加工过程所必须遵循的原则。
第二条 合同内容和范围
2.1 乙方同意向甲方转让,甲方同意从乙方取得合同产品的专有技术。甲方采用乙方的专有技术和主要设备,能够在甲方工厂生产出合格的合同产品。其产品规格、型号、产量及技术条件和技术标准详见本合同附件一。
2.2 乙方向甲方提供在甲方工厂生产合同产品的全部完整工艺文件和资料,能正确指导合同产品的生产。详见本合同附件二。
2.3 乙方在提供技术资料的同时,还要提供全部技术标准。
2.4 乙方向甲方提供用于在甲方工厂生产合同产品的全部专有技术资料必须是完整的技术资料。
2.5 乙方在向甲方提供技术的同时,并为甲方提供和选择生产合同产品所必须的关键设备。这些设备的具体要求和规格详见“设备引进合同”。设备合同的交付规定和交付办法,按设备合同的规定执行。详见“生产设备引进合同”。
2.6 为了保证合同产品的生产,乙方同意甲方采用部分中国国产设备,和乙方选择提供的设备配套共同生产合同产品。详见本合同附件三。
2.7 乙方按照本合同附件四所规定的条件和要求,在乙方工厂为甲方培训技术人员,以保证所培训的人员能够掌握这些专有技术,生产合同产品。
2.8 乙方按合同附件五所规定的条件,派遣称职的专家到甲方工厂进行技术指导、技术服务。
第三条 价格
3.1 按第二条所规定的合同内容和范围,乙方所提供的合同产品的专有技术包括工厂设计图纸,全部制造图纸,工艺文件,技术服务和技术培训等的全部资料总价格为_________美元。其中技术转让费为_________美元,考察培训费为_________美元。
3.2 上述合同的价格为固定价格,包括本合同第二条所规定的全部技术资料运抵_________费用。该价格包括乙方在本合同中所承担的其他义务的全部费用在内。
3.3 本合同内的一切费用均以美元计算和结算。
3.4 设备引进合同的总价格为_________万美元。其具体执行办法按设备合同的规定执行。
第四条 支付与支付条件
4.1 本合同项下的一切费用,用m/t信汇方式支付。甲方通过_________银行,乙方通过指定的外国银行进行支付。凡发生在中国境内的银行费用,由甲方负担,凡发生在中国境外的一切银行费用,由乙方负担。
4.2 本合同第三条3.1款所规定的总价格_________美元,由甲方按照下列比例,方式支付给乙方:
4.2.1 合同总值_________美元的_________%计_________美元,甲方在收到乙方提供的下列技术文件和单据并经审核无误后30天内由甲方以m/t方式汇付乙方:
(1)按本合同附件二的规定,乙方应于合同生效后两个月内交付所有技术文件。技术文件交付的清单和技术文件的交付空运提单各一式四份。
(2)乙方说明按本合同附件二规定,应于合同生效后两个月内交完所有技术文件的确认函正本一份。
(3)即期汇票正、副本各一份。
(4)金额_________美元的商业四份。
4.2.2 合同总值_________美元的_________%计_________美元,甲方在收到全部技术文件及技术培训开始前15天内用m/t信汇方式支付给乙方。
4.2.3 合同总值_________美元的_________%计_________美元,甲方在完成设备安装、调试合格、正式投入生产、生产出合格产品,双方签署了合格证书、并在收到乙方的下列单据后,经审查无误,30天内以m/t信汇方式支付给乙方:
(1)金额为_________美元的商业一式四份。
(2)由双方签署的合同产品考核验收合格证书一式两份。
(3)即期汇票正、副本各一份。
4.3 设备合同总值_________万美元(大写),其支付和支付办法,按设备合同的规定执行。
第五条 技术文件及设备的交付
5.1 乙方应按本合同附件二规定的内容和交付日期,将技术文件交付甲方。
5.2 设备和设备技术文件的交付,要严格按照设备合同的交付规定执行。
5.3 每批技术资料发运后的两个工作日内,乙方应用电话将发运日期,发运数量,包装件数和重量,空运提单号,合同号,班机号和预计抵达时间,通知甲方,并同时用航空挂号信将下列单据寄交甲方:
(1)空运提单正本一份,副本四份。
(2)技术文件详细清单一式三份。
5.4 全部技术文件派专人送到北京甲方,以甲方签收日视为实际交付日。
5.5 如乙方交付的技术文件在途中丢失,短缺或损坏,则乙方应在最短期间内,最迟不得超过在甲方通知后20天,免费补给甲方。
5.6 乙方发运和寄送的技术文件及资料,包装要牢固,适合于长途运输,多次装卸,防雨和防潮。在发运的每一个包装箱上面,均要用英文标志下列内容:
(1)合同号:_________
(2)收货人:_________
(3)唛头:_________
(4)目的地:_________
(5)发货人:_________
(6)重量:_________
(7)包装箱号/件号:_________
5.7 每一个包装箱内,均附有详细的装箱单一式两份。
第六条 技术的修改和改进
6.1 乙方提供的技术资料如有不适合于甲方生产条件的,如设计标准、材料标准及要求、工艺装备及其他生产条件等不适合于甲方生产实际,乙方有责任协助甲方进行修改,并由双方确认其修改的部分。
6.2 在本合同有效期内,双方对合同规定的技术内容和范围,如有任何改进和发展,双方都应互相将改进和发展的技术免费提供给对方。
6.3 改进和发展的技术,所有权属于改进和发展技术的一方,对方不得去申请专利,也不得将发展和改进的技术转让第三方。
第七条 产品的考核和验收
7.1 为了保证乙方提供合同产品的制造专有技术的正确性、可靠性和先进性,由甲方和乙方技术人员一起,在工厂按本合同附件六“考核和验收”的规定,共同对合同产品进行考核和验收:
7.2 按本合同第二条的规定,产品的技术条件、技术标准,生产图纸,均作为考核验收合同产品的依据。产品的技术文件及资料详见本合同附件一。
7.3 产品考核验收合格后,双方代表要签署验收合格证书一式四份,双方各执二份为凭。
7.4 如果考核验收达不到本合同的规定要求,则双方要友好协商,共同研究分析原因,采取措施,消除缺陷,进行第二次考核和验收。
7.5 如果第一次考核不合格属于乙方的责任,乙方须派遣专家参加第二或第三次考核和验收。其一切费用由乙方负担。如果属于甲方责任,其一切费用应由甲方负担。
7.6 如经过第二次考核仍达不到合格要求时,如系乙方责任,乙方必须赔偿甲方因此而遭受的直接损失。并要求采取措施消除缺陷,参加第三次考核,如系甲方责任,则其一切损失由甲方自负。
7.7 若经过第三次考核仍不合格,如属乙方责任,则乙方应承担由此而造成一切损失。甲方有权终止合同并按第的规定由甲方向乙方索赔。如属甲方责任,则双方应共同协商本合同的进一步执行问题。
第 保证和索赔
8.1 乙方保证向甲方提供的技术文件是乙方实际使用的、成熟的、可靠的和最新的技术资料和文件,并保证在合同的有效期间内及时向甲方提供任何新的发展的改进的技术资料。
8.2 乙方保证向甲方提供的技术文件是完整的、正确的、统一的,清晰和及时的。其有关规定如下:
完整:乙方所提供的技术文件应该包括本合同附件二所规定的全部技术文件和资料。不得有任何遗漏。
正确:乙方所提供的技术文件没有任何错误。甲方按照乙方所提供的技术文件所制造出来的产品为合格产品。
统一:乙方所提供的技术资料应有统一的符号、统一的标准、统一的规范等,不得有任何矛盾。
清晰:技术文件的图纸、曲线、文字、符号等均应清晰、明确,易读、不得模糊。
及时:技术文件的交付日期不得晚于本合同附件二所规定的交付日期。
8.3 如果乙方所交付的技术文件有不符合8.2款规定的,在收到甲方书面通知后30天内,乙方应按8.2款免费补寄技术文件给甲方。
8.4 乙方提供给甲方的设备,由乙方负责安装、调试,最终应保证达到技术工艺要求和加工质量。
8.5 若乙方为甲方提供的设备达不到8.4款的要求,则乙方负责更换和再调试,直到达到要求为止。
8.6 若任何一批技术文件的交付晚于本合同附件二规定的交付日期,从规定交付日期的第2天算起,乙方应按下列规定向甲方支付:
迟交1—4周每迟交1周罚款为合同总值的0.1%;
迟交6—8周每迟交1周罚款为合同总值的0.15%;
但上述罚款的合计不能超过合同总值的5%。
8.7 乙方在按照8.6款的规定被罚款时,将不解除乙方继续交付技术资料义务。
8.8 乙方如果迟交技术文件超过4个月则甲方有权终止合同。在这种情况下,乙方必须将甲方已经支付的全部金额并加上年利10%,尽快一并退还甲方。最迟不得超过乙方接到甲方终止合同的通知后30天。
8.9 按本合同第七条规定,由于乙方责任,验收三次不合格,且在双方同意延长的时间内,乙方仍不能消除缺陷时,则甲方有权终止合同。乙方将甲方全部已付金额连同年利10%,在8.8款所规定的时间内,一并退还甲方,并承担由此给甲方造成的一切损失。
第九条 侵权
9.1 乙方保证乙方能合法地并且有权向甲方转让合同产品专有技术而不受任何第三者干涉和指控。如果发生第三者干涉和指控,则由乙方负责同第三者进行交涉,并由乙方承担法律上和经济上的全部责任和损失。
9.2 在本合同终止后,甲方仍有权继续使用乙方提供的专有技术和全部技术文件进行合同产品的生产。
第十条 税费
10.1 凡因履行本合同而发生在甲方国家以外的一切税费,均由乙方承担。
第十一条 仲裁
11.1 凡因执行合同所发生的一切争议,均由双方通过友好协商的办法解决。如果协商仍不能解决,则双方同意将争议提交仲裁。
11.3 仲裁裁决是终局裁决,对双方均有约束力。双方均应遵守。
11.4 除了在仲裁进程中进行仲裁的那一部分外,不受仲裁影响的那一部分双方仍应继续执行。
第十二条 不可抗力
12.1 人力不可抗力:人力不可抗力的因素,如战争、严重水灾、火灾、台风、地震,以及双方同意的其他人力不可抗力因素。
12.3 因发生不可抗力而影响了合同的执行,如果事故延续20天以上,则双方应尽快通过友好协商方式协商合同的进一步执行问题。
第十三条 合同的生效终止和其他
13.1 本合同由双方代表签订后,双方分别向各自的或审理机构申请批准,以最后批准一方的日期为合同生效日期。双方均应尽最大努力在60天内获得批准,并用电传或电报通知另一方,然后用航空挂号信予以确认。
13.3 双方同意与执行本合同有关的一切联系均使用中文或英文进行。凡属正式通知以挂号信邮寄一式两份。
13.4 本合同的有效期为甲方用乙方提供的专有技术及设备生产和制造出合格的合同产品后60个月。合同有效期满,无须任何手续,则本合同自动失效。
13.5 本合同期满时,双方发生的债权债务,不受合同期满的影响,债务人应对债权人继续偿付未了债务。
13.6 本合同附件一至附件六是本合同不可分割的一部分,与合同正文具有同等效力。
13.7 本合同条款的任何改变,修改或增减,均需经双方协商同意后双方授权各自的代表签署书面文件,作为本合同不可分割的一部分,与合同其他条款一样具有同等的效力。
13.8 与本合同有关的所有技术文件和技术资料均用英文书就。
附件
no.:_________
date: _________
place: _________
forewords
this contract is signed on this date of in by and between (hereinafter referred to as party a) and (hereinafter referred to as party b).
whereas party b is in possession of the know - how to manufacture the contract products and has the right and is willing to transfer such know - how to nanfang technology co., ltd; and whereas nanfang technology co., ltd. wishes to utilize the know - how possessed by party b to manufacture, sell and exportthe contract products; party a, authorized by nanfang technology co., ltd., held friendly discussions with party b and have concluded under the following terms and conditions thie contract.
1. definitions
1.1 "know- how" shall mean all the manufacturing technology and process engineering to manufacture the contract products which are required by party a and which party b possesses. such technology engineering shall include technical details of all designs, operation drawings, technical documentations, manufacturing engineering, procedure and techniques.
1.3 "technical documentations" shall mean all the know - how necessary to manufacture the contract products and all the designs, drawings, processing techniques, and engineering documents, etc. that party b uses in manufacturing the contract products. the contents and requirements of such technical documentations are set forth in appendix 2 of this contract.
1.4 "test products" shall mean the contract products manufactured by party a with the knowhow and special equipment supplied by party b which, when tested, shall meet the technical specifications and standards as specified in appendix 1 of this contract.
1.6 "engineering regulations" shall mean those regulations which should be followed when manufacturing and processing the contract products.
2. contents & scopes of contract
2.1 party b agrees to transfer to party a and party a agrees to procure from party b the knowhow to manufacture the contract products. party a shall, in its own factory, use the know - how and equipment supplied by party b to manufacture qualilied contract products of which the specifications, types, quantity, technical specification and standards are specified in appendix 1 of the contract.
2.2 party b shall provide to party a the complete set of engineering documents and technical documentations to be used for the manufacture of contract products in party a's factory. such engineering documents and technical documentations shall correctly direct the manufacture. details are set forth in appendix 2 of the contract.
2.3 the related technical standards shall be submitted by party b at the same time the technical documentation is provided.
2.4 the technical documentation covering the know - how to meanufacture the contract products shall be complete.
2.5 in addition to providing the know - how, party b shall also select and provide to party a the key equipment necessary for the manufacture of contract products. the requirements and specifica-tions are specified in the "equipment purchase contract"(epc)of which the delivery and payment are subject to the provisions there - of.
2.6 to ensure the manufacture of contract products, party b agrees to the introduction of some domestic equipment by party a bo be used with the equipment provided by party b in the manufacture. details of such domestic equipment are set forth in appendix 4 of the contract.
2.7 party b shall, according to the conditions and requirements as specified in appendix 4, render technical training to party a' s personnel in the factory of party b so as to ensure that the personnel can master the know - how and be able to manufacture the contract products.
2.8 party b shall, according to the conditions as specified in appendix 5, assign competent ex. perts to party a's factory to render technical supervision and technical service.
3. contract price_________shall be training fee.
3.2 the above contract price is fixed and shall include the expenses to ship all the technical documentation to shenzhen as specified in chapter 2 of the contract. such contract price shall also include the expenses for party b to carry out the other contract obligations of this contract.
3.3 all the calculations and payment of expenses of this contract shall be in u/s/dollars.
3.4 the total price of the equipment shall be_________. the execution shall be subject to the provisions of the epc.
4. payment & payment conditions
4.1 the payment of all the expenses under this contract shall be made by m/t through bank of china, shenzhen branch and the bank designated by party b. all the bank expenses occuring inside china shall be borne by party a and those outside china shall be borne by party b.
4.2 payment:
4.2.1 15% of the above contract price, e. g._________shall be paid by party a to party b by m/t within 30 days after party a has received from party b the following technical documentations and documents and providing that they are in conformity with the contract:
(2)one original copy of the letter of confirmation of party b to complete the technical documentations as specified in appendix 2 of the contract within 2 months after the contract takes effect.
(3)sight draft one original and one copy.
(4)commercial invoice of _________in four copies.
4.2.2 _________of the_________contract price amounting to_________shall be paid by party a to party b by m/t after party a has received all the technical documentations and 15 days prior to the technical training.
4.2.3 _________of the_________contract price amounting to_________shall be paid by party a to party b by m/t after in installation and testing of the equipment are completed, the equipment is put into operation and produces qualified products and both parties have signed certificate of acceptance, and within 30 days after party a has received the following documents and proved that they are in conformity with the contract:
(1)commercial invoice of_________in four copies.
(2)certificate of acceptance of contract product quality signed by both parties in two copies.
(3)original and copy of sight draft one copy respectively.
4.3 payment and terms of payment of the epc amounting to_________shall be subject to the provisions thereof.
5. delivery of technical documentations & equipment
5.2 the delivery of the equipment and equipment technical documents shall be subject to the terms of delivery of the epc.
5.3 within 2 working days after each lot of technical documentations is shipped, party b shall notify party a by telephone the date of shipment, quantity, number of cases, weight, number of airbill of lading, contract number, flight number and expected date of arrival and send by air - mail - register to party a the following documents:
(1)air bill of lading one original and four copies.
(2)detailed list of technical documentations in three copies.
5.4 if the technical documentations are hand carried to shenzhen, the date when party a signs the receipt shall be taken as the date of delivery of the technical documentations.
5.5 in case of any loss, shortage of damage of the technical documentations during shipment, party b shall, within the possible shortest time which, however, doesn't exceed 20 days from notification by party a, make replacement to party a free of charge.
5.6 the packing of the technical documentations should be strong, suitable for long distance transportation and repeated loading and unloading. precautions against rain and moisture shall also be taken. each case shall be marked in english indicating the following contents:
(1)contract number:_________
(2)consignee:_________
(3)shipping mark:_________
(4)destination:_________
(5)consignor:_________
(6)weight:_________
(7)case number:_________
5.7 in each case, a detailed packing list in two copies shall be inserted.
6. modifications & improvement of technology
6.1 in the event there is any part in the technical documentations not suitable for party a's practical production conditions, such as standards of design, standards and requirements on materials, engineering and facilities, party b shall be responsible to assist party a to make modifications which shall then be confirmed by both parties.
6.2 during the term of contract, if either party makes any improvement and development with regard to the technology contents and scopes of the contract, such party shall provide the information of the improvement and development to the other party free of charge.
6.3 the ownership of the above improvement and development shall be retained to the providing party. the other party shall not be entitled to any application for patent, neither shall the other party transfer such improved and developed technology to any third party.
7. assessment & acceptance of products
7.1 to ensure that the know- how supplied by party b is correct, reliable and advanced, both parties shall jointly perform in party a's factory the assessment and acceptance of the contract products in accordance with the provisions of appendix 6 of the contract.
7.2 according to chapter 2, the technical requirements, standards and drawings shall be taken as evidence of the assessment and acceptance of contract products. the details are set - forth in appendix 1 of the contract.
7.3 if the contract products are qualified, both parties shall jointly sign a certificate of acceptance in four copies, two for each party.
7.4 if the products cannot meet the requirements of the contract, both parties shall hold friendly discussions to analyse the reasons and take measures to correct any defect and prepare for the second assessment and acceptance of the contract products.
7.5 if the failure of the first assessment and acceptance is due to party b's responsibility, party b shall send experts to participate in the second or the third assessment and acceptance, and expenses thus occur shall be borne by party b; if the failure is due to party a's responsibility, the expenses shall be borne by party a.
7.6 if after the second assessment and acceptance the products still cannot meet the requirements, if the responsibility lies in party b, party b shall compensate party a for the direct economic losses thus occur, take measures to correct the defects and participate in the third assessment and acceptance; if the responsibility lies in party a, all the losses shall be borne by party a itself.
7.7 if the products are still not qualified after the third assessment and acceptance and the responsibility lies in party b, party b shall be responsible for all the losses thus caused and party a shall have the right to terminate the contract and raise a claim against party b according to chapter 8; if the responsibility has in party a, both parties shall mutually discuss the further implementations of the contract.
8. guarantee & claim
8.1 party b guarantees that technical documentations are those used by party b and such documentations are proved reliable and of latest technology. party b also guarantees that during the term of contract, party b shall notify party a on time of any development and improvement of the technology it achieves.
8.2 party b guarantees that the delivered technical documentations are complete, correct, uniform, clear and the delivery is on time. detailed requirements are as follows;
complete: the technical documentations delivered by party b shall include all those specified in appendix 2 of the contract without omission.
correct: there is no error in the technical documentations delivered by party b. when party a strictly follows such documentations, the products manufactured are qualified.
uniform: all the signs, standards and specifications used in the technical documentions are uniform and there is no contradiction.
clear: all the drawings, lines, language notes, signs, etc. used in the technical documentations are clear and easy to read.
on time: the date of delivery of the technical documentations shall not be later than the delivery schedule as set forth in appendix 2 of the contract.
8.3 if there is any part of the technical documentations not in conformity with the requirements of 8.2, party b shall, within 30 days from receipt of notice from party a, make supplements or replacements free of charge.
8.4 the delivered equipment shall be installed and tested by party b and shall fully comply with the technical requirements and processing quality of the contract.
8.5 if the equipment supplied by party b cannot meet the requirements of 8. 4, party b shall replace and retest such equipment until it meets the requirements.
8.6 if any portion of the technical documentations is delivered late as specified in appendix 2 of the contract, party b shall, from the 2nd day, pay to party a a penalty as follows:
for late delivery of 1 to 4 weeks, the rate of penalty shall be o. 1% of the total contract price per each delayed week;
for late delivery of 5 to 8 weeks, the rate of penalty shall be o. 15% of the total contract price per each delayed week;
for late delivery of more than 8 weeks, the rate of penalty shall be 0.2 % of the total contract price per each delayed week.
however, the total amount of the above penalty shall not exceed 5 % of the total contract price.
8.7 the payment of any penalty by party b according to 8. 6 shall not release the obligation of party b to continue the delivery of the technical documentations.
8.8 in case the late delivery of the technical documentations exceeds 4 months, party a shall have the right to terminate the contract. in this case, party b shall refund to party a the amount which party a has paid to party b plus the related interest at the rate of 10% per year immediately, but in no case shall such refunding by party b exceeds 30 days from receipt from party a of the notice to terminate the contract.
8.9 in case the acceptance of the contract products according to chapter 7 cannot be successful after three attempts due to party b' s responsibility, and within the mutually agree - upon extended period, party b still cannot correct the defects, party a shall have the right to terminate the contract.in this case, party b shall refund to party a the amount which party a has paid to party b plus the related interest at the annual rate of 10% within the time specified in 8.8 and be responsible for the losses thus caused to party a.
9. intringement
9.1 party b guarantees that it can legally transfer the know - how of the contract products to party a without any interference or charge from any third party. in case of any interference or charge from a third party, they shall be handled by party b and the third party. the responsibility and loss, either legally or economically, shall be borne by party b.
9.2 after termination of the contract term, party a shall still have the right to use the know- how and technical documentations to manufacture contract products.
10. tax
10.1 any tax relating to the implementation of the contract imposed by party a's country shall be paid by party b.11. arbitration
11.1 any dispute arising from the implementation of the contract shall be settled through friendly consultations. if no settlement can be reached, both parties shall agree to submit the dispute for arbitration.
11.3 the result of such arbitration shall be final and binding upon both parties.
11.4 both parties shall continue their respective contract obligations except those under arbitration.
12. force majeure
12.1 force majeure shall refer to war, flood, fire, typhoon, earthquake and other accidents that both parties mutually agree as force majeure.
12.3 if the implementation is affected by force majeure and the accident lasts for more than 20 days, both parties shall hold friendly discussions as soon as possible with regard to the further implementation of the contract.
13. effectiveness, termination of contract & miscellaneous
13.1 after this contract is signed by the duly authorized representatives of both parties, both parties shall submit the contract to their governments or boards of directors for approval. the date when the later party obtains the approval shall be taken as the effective date of the contract. both parties shall attempt to get the contract approval within 60 days from signing and notify by telex or cable the other party of the approval which is confirmed by the following registered air - mail letter.
13.3 correspondence relating to the implementation of the contract between both parties shall be in either chinese or english. formal notice sent by registered mail shall be in duplicate.
13.4 the term of contract shall be 60 months from the date when party a can manufacture qualified contract products with the know- how and equipment supplied by party b. upon expiration of such term of contract, the contract shall automatically become voil and null.
13.5 the termination of the contract shall not release any party from the obligations to pay the debts between the two parties.
13.6 the six appendices shall form an integral part of the contract and shall bear the same force as the contract itself.
13.7 any changes or amendments to the contract cause shall be mutually agreed upon by both parties and signed by duly authorized representatives. such changes or amendments shall be an integral part of the contract and have the same force as the other clauses.
13.8 all the technical documentations shall be written in english.
party a(signature):_________
party b(signature):_________
date:_________
date:_________
本合同于________年____月____日在_________签订。
一方为_________,以下简称甲方。
一方为_________,以下简称乙方。
鉴于乙方拥有合同产品生产的专有技术,并有权和愿意向XX公司转让该项技术。
鉴于XX公司希望利用乙方所拥有的专有技术,以生产销售和出口合同产品。
甲方受XX公司委托,由甲方同乙方经过友好协商,同意按下列条件及条款签订本专有技术合同。本合同由XX公司与乙方执行。
第一条 定义
1.1 专有技术,原指生产合同产品,甲方所需要的乙方所拥有和提供的全部生产技术及加工工艺。该生产技术和加工工艺包括全部设计、制造、操作图纸及技术资料、制造工艺、生产程序和生产技术细节。
1.3 技术资料,指制造合同产品所需要的全部专有技术,以及乙方在生产合同产品的过程中,所使用的全部有关设计和制造图纸,加工技术和工艺文件等资料。具体内容及要求详见本合同附件二。
1.4 考核产品,指甲方用乙方提供的专有技术和专用设备所生产和制造的合同产品。该产品经过验证符合并且达到本合同附件一所规定的技术条件和技术标准。
1.5 工艺文件,指生产合同产品所需要的全部加工方法、加工手段、工艺过程卡片、工艺图纸、工序卡片等全套资料。具体内容详见本合同附件二。
1.6 工艺守则,指生产合同产品的全部生产和加工过程所必须遵循的原则。
第二条 合同内容和范围
2.1 乙方同意向甲方转让,甲方同意从乙方取得合同产品的专有技术。甲方采用乙方的专有技术和主要设备,能够在甲方工厂生产出合格的合同产品。其产品规格、型号、产量及技术条件和技术标准详见本合同附件一。
2.2 乙方向甲方提供在甲方工厂生产合同产品的全部完整工艺文件和资料,能正确指导合同产品的生产。详见本合同附件二。
2.3 乙方在提供技术资料的同时,还要提供全部技术标准。
2.4 乙方向甲方提供用于在甲方工厂生产合同产品的全部专有技术资料必须是完整的技术资料。
2.5 乙方在向甲方提供技术的同时,并为甲方提供和选择生产合同产品所必须的关键设备。这些设备的具体要求和规格详见设备引进合同。设备合同的交付规定和交付办法,按设备合同的规定执行。详见生产设备引进合同。
2.6 为了保证合同产品的生产,乙方同意甲方采用部分中国国产设备,和乙方选择提供的设备配套共同生产合同产品。详见本合同附件三。
2.7 乙方按照本合同附件四所规定的条件和要求,在乙方工厂为甲方培训技术人员,以保证所培训的人员能够掌握这些专有技术,生产合同产品。
2.8 乙方按合同附件五所规定的条件,派遣称职的专家到甲方工厂进行技术指导、技术服务。
第三条 价格
3.1 按第二条所规定的合同内容和范围,乙方所提供的合同产品的专有技术包括工厂设计图纸,全部制造图纸,工艺文件,技术服务和技术培训等的全部资料总价格为_________美元。其中技术转让费为_________美元,考察培训费为_________美元。
3.2 上述合同的价格为固定价格,包括本合同第二条所规定的全部技术资料运抵_________费用。该价格包括乙方在本合同中所承担的其他义务的全部费用在内。
3.3 本合同内的一切费用均以美元计算和结算。
3.4 设备引进合同的总价格为_________万美元。其具体执行办法按设备合同的规定执行。
第四条 支付与支付条件
4.1 本合同项下的一切费用,用信汇方式支付。甲方通过_________银行,乙方通过指定的外国银行进行支付。凡发生在中国境内的银行费用,由甲方负担,凡发生在中国境外的一切银行费用,由乙方负担。
4.2 本合同第三条3.1款所规定的总价格_________美元,由甲方按照下列比例,方式支付给乙方:
4.2.1 合同总值_________美元的_________%计_________美元,甲方在收到乙方提供的下列技术文件和单据并经审核无误后30天内由甲方以方式汇付乙方:
(1)按本合同附件二的规定,乙方应于合同生效后两个月内交付所有技术文件。技术文件交付的清单和技术文件的交付空运提单各一式四份。
(2)乙方说明按本合同附件二规定,应于合同生效后两个月内交完所有技术文件的确认函正本一份。
(3)即期汇票正、副本各一份。
(4)金额_________美元的商业四份。
4.2.2 合同总值_________美元的_________%计_________美元,甲方在收到全部技术文件及技术培训开始前15天内用信汇方式支付给乙方。
4.2.3 合同总值_________美元的_________%计_________美元,甲方在完成设备安装、调试合格、正式投入生产、生产出合格产品,双方签署了合格证书、并在收到乙方的下列单据后,经审查无误,30天内以信汇方式支付给乙方:
(1)金额为_________美元的商业一式四份。
(2)由双方签署的合同产品考核验收合格证书一式两份。
(3)即期汇票正、副本各一份。
4.3 设备合同总值_________万美元(大写),其支付和支付办法,按设备合同的规定执行。
第五条 技术文件及设备的交付
5.1 乙方应按本合同附件二规定的内容和交付日期,将技术文件交付甲方。
5.2 设备和设备技术文件的交付,要严格按照设备合同的交付规定执行。
5.3 每批技术资料发运后的两个工作日内,乙方应用电话将发运日期,发运数量,包装件数和重量,空运提单号,合同号,班机号和预计抵达时间,通知甲方,并同时用航空挂号信将下列单据寄交甲方:
(1)空运提单正本一份,副本四份。
(2)技术文件详细清单一式三份。
5.4 全部技术文件派专人送到北京甲方,以甲方签收日视为实际交付日。
5.5 如乙方交付的技术文件在途中丢失,短缺或损坏,则乙方应在最短期间内,最迟不得超过在甲方通知后20天,补给甲方。
5.6 乙方发运和寄送的技术文件及资料,包装要牢固,适合于长途运输,多次装卸,防雨和防潮。在发运的每一个包装箱上面,均要用英文标志下列内容:
(1)合同号:_________
(2)收货人:_________
(3)唛头:_________
(4)目的地:_________
(5)发货人:_________
(6)重量:_________
(7)包装箱号件号:_________
5.7 每一个包装箱内,均附有详细的装箱单一式两份。
第六条 技术的修改和改进
6.1 乙方提供的技术资料如有不适合于甲方生产条件的,如设计标准、材料标准及要求、工艺装备及其他生产条件等不适合于甲方生产实际,乙方有责任协助甲方进行修改,并由双方确认其修改的部分。
6.2 在本合同有效期内,双方对合同规定的技术内容和范围,如有任何改进和发展,双方都应互相将改进和发展的技术提供给对方。
6.3 改进和发展的技术,所有权属于改进和发展技术的一方,对方不得去申请专利,也不得将发展和改进的技术转让第三方。
第七条 产品的考核和验收
7.1 为了保证乙方提供合同产品的制造专有技术的正确性、可靠性和先进性,由甲方和乙方技术人员一起,在工厂按本合同附件六考核和验收的规定,共同对合同产品进行考核和验收:
7.2 按本合同第二条的规定,产品的技术条件、技术标准,生产图纸,均作为考核验收合同产品的依据。产品的技术文件及资料详见本合同附件一。
7.3 产品考核验收合格后,双方代表要签署验收合格证书一式四份,双方各执二份为凭。
7.4 如果考核验收达不到本合同的规定要求,则双方要友好协商,共同研究分析原因,采取措施,消除缺陷,进行第二次考核和验收。
7.5 如果第一次考核不合格属于乙方的责任,乙方须派遣专家参加第二或第三次考核和验收。其一切费用由乙方负担。如果属于甲方责任,其一切费用应由甲方负担。
7.6 如经过第二次考核仍达不到合格要求时,如系乙方责任,乙方必须赔偿甲方因此而遭受的直接损失。并要求采取措施消除缺陷,参加第三次考核,如系甲方责任,则其一切损失由甲方自负。
7.7 若经过第三次考核仍不合格,如属乙方责任,则乙方应承担由此而造成一切损失。甲方有权终止合同并按第的规定由甲方向乙方索赔。如属甲方责任,则双方应共同协商本合同的进一步执行问题。
第 保证和索赔
8.1 乙方保证向甲方提供的技术文件是乙方实际使用的、成熟的、可靠的和的技术资料和文件,并保证在合同的有效期间内及时向甲方提供任何新的发展的改进的技术资料。
8.2 乙方保证向甲方提供的技术文件是完整的、正确的、统一的,清晰和及时的。其有关规定如下:
完整:乙方所提供的技术文件应该包括本合同附件二所规定的全部技术文件和资料。不得有任何遗漏。
正确:乙方所提供的技术文件没有任何错误。甲方按照乙方所提供的技术文件所制造出来的产品为合格产品。
统一:乙方所提供的技术资料应有统一的符号、统一的标准、统一的规范等,不得有任何矛盾。
清晰:技术文件的图纸、曲线、文字、符号等均应清晰、明确,易读、不得模糊。
及时:技术文件的交付日期不得晚于本合同附件二所规定的交付日期。
8.3 如果乙方所交付的技术文件有不符合8.2款规定的,在收到甲方书面通知后30天内,乙方应按8.2款补寄技术文件给甲方。
8.4 乙方提供给甲方的设备,由乙方负责安装、调试,最终应保证达到技术工艺要求和加工质量。
8.5 若乙方为甲方提供的设备达不到
8.4款的要求,则乙方负责更换和再调试,直到达到要求为止。
8.6 若任何一批技术文件的交付晚于本合同附件二规定的交付日期,从规定交付日期的第2天算起,乙方应按下列规定向甲方支付:
迟交14周每迟交1周罚款为合同总值的0.1%;
迟交68周每迟交1周罚款为合同总值的0.15%;
但上述罚款的合计不能超过合同总值的5%。
8.7 乙方在按照
8.6款的规定被罚款时,将不解除乙方继续交付技术资料义务。
8.8 乙方如果迟交技术文件超过4个月则甲方有权终止合同。在这种情况下,乙方必须将甲方已经支付的全部金额并加上年利10%,尽快一并退还甲方。最迟不得超过乙方接到甲方终止合同的通知后30天。
8.9 按本合同
第七条规定,由于乙方责任,验收三次不合格,且在双方同意延长的时间内,乙方仍不能消除缺陷时,则甲方有权终止合同。乙方将甲方全部已付金额连同年利10%,在
8.8款所规定的时间内,一并退还甲方,并承担由此给甲方造成的一切损失。
第九条 侵权
9.1 乙方保证乙方能合法地并且有权向甲方转让合同产品专有技术而不受任何
第三者干涉和指控。如果发生
第三者干涉和指控,则由乙方负责同
第三者进行交涉,并由乙方承担法律上和经济上的全部责任和损失。
9.2 在本合同终止后,甲方仍有权继续使用乙方提供的专有技术和全部技术文件进行合同产品的生产。
第十条 税费
10.1 凡因履行本合同而发生在甲方国家以外的一切税费,均由乙方承担。
第十一条 仲裁
11.1 凡因执行合同所发生的一切争议,均由双方通过友好协商的办法解决。如果协商仍不能解决,则双方同意将争议提交仲裁。
11.3 仲裁裁决是终局裁决,对双方均有约束力。双方均应遵守。
11.4 除了在仲裁进程中进行仲裁的那一部分外,不受仲裁影响的那一部分双方仍应继续执行。
第十二条 不可抗力
12.1 人力不可抗力:人力不可抗力的因素,如战争、严重水灾、火灾、台风、地震,以及双方同意的其他人力不可抗力因素。
12.3 因发生不可抗力而影响了合同的执行,如果事故延续20天以上,则双方应尽快通过友好协商方式协商合同的进一步执行问题。
第十三条 合同的生效终止和其他
13.1 本合同由双方代表签订后,双方分别向各自的或审理机构申请批准,以最后批准一方的日期为合同生效日期。双方均应尽最大努力在60天内获得批准,并用电传或电报通知另一方,然后用航空挂号信予以确认。
13.3 双方同意与执行本合同有关的一切联系均使用中文或英文进行。凡属正式通知以挂号信邮寄一式两份。
13.4 本合同的有效期为甲方用乙方提供的专有技术及设备生产和制造出合格的合同产品后60个月。合同有效期满,无须任何手续,则本合同自动失效。
13.5 本合同期满时,双方发生的债权债务,不受合同期满的影响,债务人应对债权人继续偿付未了债务。
13.6 本合同附件一至附件六是本合同不可分割的一部分,与合同正文具有同等效力。
13.7 本合同条款的任何改变,修改或增减,均需经双方协商同意后双方授权各自的代表签署书面文件,作为本合同不可分割的一部分,与合同其他条款一样具有同等的效力。
甲方:(中方)_______________________________
法定地址:__________________________________
乙方:(外方)_______________________________
法定地址:__________________________________
合同签约日:________________________________
合同签约地:________________________________
前言
鉴于乙方拥有__技术,并有能力制造合同设备,乙方有权利并愿意许可给甲方;
鉴于甲方愿意从乙方获得制造合同设备的技术及合同设备。
为此,双方在协商一致的基础上,同意按如下条款签订本合同。
第一章定义
1.1.合同产品指本合同附件一中所列的全部产品。
1.2.技术资料:包括专利申请文件及实施与该专利有关的(产品设计图纸、工艺图纸、工艺配方、工艺流程以及制造合同产品所需的工装、设备清单等)技术资料。
1.3.蓝图指乙方制造合同产品目前所使用的总图、制造图钎、材料规范及零件目录等的复制件。
1.4.标准指为制造合同产品向甲方提供的技术资料中,由乙方采用和制定的标难。
1.5. “净销售额”是指产品的市场销售价扣除包装费、保险费、仓储费、运输费、商业折扣、各种税收等费用及扣除供方提供的零部件价格。
1.6.合同有效期指本合同开始生效的时间到本合同14.3条规定的本合同终止时间的期间。
第二章合同内容
2.1.乙方同意向甲方提供制造———合同产品的书面及非书面专有技术。用该项技术所生产的合同产品的品种、规格、技术性能等详见本合同附件一(略)。
2.2.乙方负责向甲方提供制造、使用和销售合同产品的专有技术和其他所有有关技术资料。技术资料的内容及有关事项详见本合同附件二(略)。
2.3.乙方负责安排甲方技术人员在乙方工厂进行培训,乙方应采取有效措施使甲方人员掌握制造合同产品的技术。具体内容见本合同附件三(略)。
2.4.乙方派称职的技术人员赴甲方合同工厂进行技术服务。具体要求详见本合同附件四(略)。
2.5.乙方同意在甲方需要时,以最优惠的价格向甲方提供合同产品的备件。届时双方另签协议。
2.6.乙方有责任对本合同项目甲方需要的关键设备提供有关咨询。
2.7.乙方应向甲方提供合同产品的样机、铸件和备件,具体内存详见本合同附件五(略)。
2.8.甲方销售合同产品和使用乙方商标的规定,见本合同第八章。
第三章价格
3.1.按本合同第一章规定的内容,甲方向乙方支付的合同费用规定如下:
3.1.1.入门费为_________(币种)(大写)这是指合同产品有关的资料转让费和技术培训费,包括技术资料在交付时的一切费用,入门费为固定价格。
3.1.2.合同产品考核验收合格后,甲方每销售一台合同产品的提成费为净销售额的——%。
第四章支付和支付条件
4.1.本合同项下的一切费用,甲方和乙方均以________(币种)支付。甲方支付给乙方的款项应通过中国____银行和______国银行办理。如果乙方向甲方偿还金额,则此款项应通过_______银行印中国_______银行办理。所有发生在中国银行的费用,由甲方负担,发生在中国以外的银行费用由乙方负担。
4.2.本合同第三章规定的合同费用,甲方按下列办法和时间向乙方支付:
4.2.1.甲方收到下列单据,并审查无误后______天内向乙方支付入门费______(币种)(大写)。
(a)由乙方出具的保证函。在乙方不能按照合同规定交付技术资料时,保证偿还______(币种)。
(b)即期汇票正、副本各一份。
(c)应支付金额为入门费总价的形式正本一份,副本三份。
(d)乙方出具的第一阶段产品的技术资料、样机、铸件和备件交付完毕的证明信正、副本各一份。
4.2.2.甲方收到乙方交付第二阶段产品的下列单据,并审查无误后_________天内向乙方支付________美元(大写)。
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
(c)空运提单正本一份,副本三份。
(d)乙方出具的第二阶段产品技术资料、样机、附件五规定的________己交付完毕的证明信正、副本各一份。
4.2.3.合同产品第一批样机验收合格后,甲方收到乙方下列数据,并审查无误后______天内,向乙方支付________美元(大写)。
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
(c)双方签署的“合同产品考核验收合格证书”影印本一份。注:如果验收试验延迟并是甲方的责任,将不迟于合同生效后(时间)支付。
4.3.本合同第三章规定的提成费,甲方将在抽样产品考核验收合格后按下述办法和条件向乙方支付。
4.3.1.甲方在每日历年度结束后________天内,向乙方提交一份甲方在上一日历年度的每种型号的产品实际销售量的报告。
4.3.2.乙方每年可派代表到合同工厂检查和核实甲方合同产品实际销售量的报告,甲方将给予协助。
乙方来华费用由乙方负担。如果汇总和或报告中所列的合同产品数量在检查时发现出入很大,则甲乙双方应讨论此差距并洽商采取的正确的措施。
4.3.3.甲方收到乙方下列单据,并审查无误后_______天内向乙方支付提成费:
(a)即期汇票正、副本各一份。
(b)商业正本一份,副本三份。
(c)该年提成费计算书一式四份。
4.3.4.在合同期满年度内,甲方在合同终止后______天内将提交一份最后销售合同产品数量的报告,以便乙方计算提成费。
4.4.按本合同规定,如乙方需向甲方支付罚款或赔偿时,甲方有权从上述任何一次支付中扣除。
第五章技术资料的交付
5.1.乙方应按本合同附件二的规定向甲方提供技术资料。
5.2.乙方应在________机场或车站交付技术资料。________机场或车站的印戳日期为技术资料的有效交付日期。甲方应在收到资料两周内,确认资料收悉。
5.3.第一阶段产品的技术资料、样机、铸件和备件。
5.3.1.在合同生效后的________周内,乙方必须发出一套蓝图、一套二底图和一套标准。可以分批交货。
5.3.2.在合同生效后的________周内,乙方必须发出与第一阶段合同产品有关的全部技术资料、样机、铸件和备件。
5.4.第二阶段产品的技术资料和样机。
5.4.1.第二阶段开始日期后的________周内,乙方必须发出与第二阶段产品有关的一套蓝图、一套二底图和一套标准。可以分期交货。
5.4.2.第二阶段开始后的________周内,乙方必须尽快发出与第二阶段合同产品有关的全部技术资料和样机、铸件和备件。
5.5.在每批技术资料或样机、铸件和备件发运后的小时内,乙方应将空运提单号、空运提单日期、资料编号、合同号、件数和重量电告甲方,同时乙方应以航空信将下列单据寄给甲方:
(a)空运提单正本一份,副本两份。
(b)所发运技术资料、样机、铸件和备件的详细清单一式二份。
5.6.若乙方提供的技术资料或样机、铸件和备件在运输途中遗失或损坏,乙方在收到甲方关于遗失或损坏的书面通知书后,应尽快不迟于__________个月内免费补寄或重寄给甲方。
5.7.交付技术资料应具有适于长途运输、多次搬运、防雨、防潮的坚固包装。在每件包装箱的内部与外表,都应以英文标明下列内容:
(a)合同号
(b)运输标记
(c)收货人
(d)技术资料目的`地
(e)重量(千克)
(f)样机、铸件和备件目的地
5.8.每箱内应附有详细装箱单一式四份。
第六章技术资料的改进和修改
6.1.为了适应中国的设计标准、材料、工艺装备和其他生产条件,在不改变乙方基本设计的条件下,甲方有权对乙方的技术资料进行修改和变动。甲方必须将这些修改和变动通知乙方。乙方有责任在培训或技术指导时协助甲方修改技术资料(详见附件六和附件七)(略)。
6.2.甲方必须在型号后加注尾标,以示区别那些影响形状、配合或功能的修改,并通知乙方。
6.3.合同有效期内,双方在合同规定的范围内的任何改进和发展,都应相互免费将改进发展的技术资料提交给对方。
6.4.改进和发展的技术,所有权属改进、发展的一方。
第七章质量验收试验
7.1.为了验证按乙方提供的技术资料制造的合同产品可靠性,由甲、乙双方共同在合同工厂对考核的合同产品的技术性能和要求进行考核验收。如果需要,也可以在乙方工厂进行试验或重做。甲方可派指定的人员验证重复试验,乙方负责重复试验和乙方人员的费用,甲方负责甲方参加重复试验的人员和翻译的费用,具体办法见本合同附件八。(附件中附考核的标准和几次考核的期限(略))
7.2.考核试验产品的技术性能应符合乙方提供的本合同中的标准规定,即通过鉴定。甲、乙双方签署“合同产品考核验收合格证明”一式两份,每方各执一份。
7.3.如考核试验产品的技术性能达不到附件规定的技术参数,双方应友好协商、共同研究分析原因,采取措施。消除缺陷后进行第二次考核验收。
7.4.如考核试验产品不合格是乙方的责任,则乙方派人参加第二次考核验收的一切费用,由乙方负担。如系甲方责任,该费用则由甲方负担。
7.5.若考核试验产品第二次试验仍不合格时,如系乙方的责任,乙方应赔偿甲方遭受的直接损失,并采取措施消除缺陷,参加第三次考核,费用由乙负担;如系甲方责任,该费用由甲方负担。
7.6.若考核试验产品第三次考核试验不合格时,双方应讨论执行合同的问题,如系乙方责任,则按合同9.规定,甲方有权修正合同。如系甲方责任,则由双方共同协商进一步的执行问题。乙方将根据甲方的要求,为改进不合格的样机提供技术咨询。
第八章“合同产品”的出口和商标
8.1.甲方生产的“合同产品”可在中华人民共和国国内销售,可根据下列条件出口到其他国家:
8.1.1.甲方应首先与乙方协商,要求在乙方的销售/分配网所在地区安排销售(销售、分配网包括乙方子公司和代理商)。出口销售的数量和项目将通过友好协商决定,若无法安排,则甲方可以自由出口,但是,甲方必须在完成交易后一周内,将项目、数量和购买商名称通知乙方。
8.1.2.在乙方销售/分配网不包括的地区,甲方可以自由销售。
8.2.对于甲方把“合同产品”出售到任何国家(包括在乙方销售/分配网所在地国家)的权利,乙方不得干涉。为维修中国出口的主权,甲方可以自由销售作为配件的“合同产品”。
8.3.在合同期间,甲方可以在“合同产品”上使用乙方使用的商标和标上甲方的商标,并注上“中华人民共和国________厂制造”。商标许可证应由甲方和________公司单独签订。
8.4.当使用商标时,甲方生产的“合同产品”必须符合本合同攻下由乙方提供的标准。在必要的时候,每年乙方可进行一次抽样试验。在抽样试验结果不符合乙方提供的标准时,乙方应建议甲方改进不合格的“合
同产品”并在________个月内再次进行试验。若结果仍不符合,则乙方就可中止甲方使用其商标的权利。甲方可以再次提交另外的样品给乙方进行试验。再次抽样试验,结果符合乙方提供的标准时,乙方将再次给予甲方使用其商标的权利。
第九章保证
9.1.乙方保证其提供的技术资料是在合同生效时乙方使用的最新技术资料,并与乙方拥有的技术资料完全一致。在合同期间,“合同产品”设计变化的技术通知书和技术改进、发展资料,乙方将及时地送至甲方。
9.2.乙方保证其提供的技术资料是完整的、清晰的、可靠的,并按第五章的规定按时交付,有关定义如下:
9.2.1.“完整”系指乙方提供的资料是本合同附件中规定的全部资料,并与乙方自己工厂目前使用的资料完全一致。
9.2.2.“可靠只系指甲方按技术资料制造的合同产品应符合乙方按本合同提供的合同产品技术规范。
9.2.3.“清晰”系指资料中的图样、曲线、术语符号等容易看清。
9.3.如果乙方提供的技术资料不符合9.2条的规定时乙方必须收到甲方书面通知书后______天内免费将所缺的资料,或清晰、可靠的资料寄给甲方。
9.4.当乙方不能按本合同第五章或9.3条规定的时间交付资料:则乙方应按下列比例向甲方支付罚款:迟交____至____周,每整周罚款为入门费总价的____%迟交超过_____周以上,每整周罚款为入门费总价的________%
9.5.若发生9.4条事项,乙方支付给甲方的罚款总数不超过________(币种)(大写)。
9.6.乙方支付给甲方的9.4中规定的罚款,应以迟交的整周数进行计算。
9.7.乙方支付给甲方罚款后,并不解除乙方继续交付上述资料的义务。
9.8.按第七章的规定,由于乙方的责任,产品考核经三次不合格时,则按以下办法处理:
9.8.1.若考核产品不合格以致甲方不能投产,则必须修改合同,采取有效措施将不合格的产品从合同中删除,乙方应退还甲方已经支付的那部分金额。这部分退还金额仅限于合同产品总的范围中不合格产品所占部分,并加年利———%的利息。
9.8.2.如果根据9.8.1条修改合同,则甲方放弃只涉及不合格的那部分产品和零件的制造权,甲方将退回有助于制造这些不合格产品的全部文件,不可复制或销毁。
第十章许可证和专有技术
10.1.乙方应当保证自己是所提供技术的合法拥有者,或者保证自己有权转让或者许可该项技术。甲方使用转让或者许可的技术生产或者销售产品如被第三方指控侵权,应当由乙方负责应诉;如被第三方指控的侵权成立,甲方的经济损失由乙方负责赔偿。
10.2.本合同终止后,甲方仍有权使用乙方提供的许可证和专有技术,而不承担任何义务和责任。
10.3.在合同期限内双方就履行本合同,不应以任何方式向任何第三者透露和公布双方提供的任何技术资料或商业情报。
第十一章税费
11.1.凡因履行本合同而引起的一切税费,发生在中国以外的应由乙方承担。
11.2.乙方应按中华人民共和国税法的规定纳税,此税费由甲方在每次支付时扣交,并将税务局的收据副本一份交乙方。
第十二章仲裁
12.1.凡因执行本合同而引起的一切争执,应由双方通过友好协商来解决。在不能解决时,则提交仲裁解决。
12.2.仲裁地点在北京,由中国国际贸易促进委员会对外经济贸易仲裁委员会依据该会仲裁程序暂行规则进行仲裁。(或仲裁也可在瑞典的斯德哥尔摩进行,并由斯德哥尔摩商会仲裁院按仲裁的程序进行仲裁,或另选第三国)
12.3.仲裁裁决应是终局裁决,对双方均有约束力,双方都应遵照执行。
12.4.仲裁费由败诉一方负担。
12.5.在仲裁过程中,本合同中除了接受仲裁的部分外,仍应由双方继续执行。
第十三章不可抗力
13.1.若签约的任何一方,由于战争及严重的火灾、水灾、台风或地震等所引起的双方不可预见,不可避免,并超出双方各自控制范围事件,影响了合同的执行时,则应延迟合同期限,延迟时间应相当于事故所影响的时间。
13.2.责任方应尽快地将发生的人力不可抗拒事故电告另一方,并在________天内以航空挂号将有关当局出具的证明文件提交另一方确认。
13.3.若人力不可抗拒事故延续到_______天以上时,双方应通过友好协商尽快解决合同继续执行问题。
第十四章合同生效及其他
14.1.合同在甲方和乙方代表签字,并经中国机关注册的生效。
14.2.本合同用________文和中文书写各四份,________文文本和中文文本具有同等效力。双方执中、文本各二份。
14.3.本合同从合同生效(或签字)之日起________年内有效。有效期满后,本合同即自动失效。
14.3.1.合同期满前________个月之前的任何时候,甲方或乙方均可提出要求进行合同延期的谈判,届时签订合同延期的专门条款。
14.4.合同终止前,任何合同项下发生的末清理的赊欠和债务将不受合同终止的影响;合同的终止并不能解除债务赊欠一方对另一方的债务。
14.5.本合同附件均为本合同不可分割的部分,与合同正文具有同等效力。
14.6.合同签字前双方之间的所有来往通信文电,从合同生效之日起自动失效。
14.7.只有根据双方授权代表签字的书面文件并报原中国注册机关再注册才能对本合同进行更改和补充。这些文件将成为合同不可分割的部分。
14.8.双方为履行本合同而进行的通信应以________国文书写一式二份。
第十五章法定地址
甲方:____乙方:____
签字人:_________ (人名签字)_________(人名打印)
签字人:________(人名签字)________(人名打印)
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- 91gzw.com 版权所有
违法及侵权请联系:TEL:199 18 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务