 主斜井清理斜巷作业规程

华晋吉宁煤业有限责任公司

主斜井清理斜巷施工作业规程

施工单位: 项目经理: 编 制: 编制日期:

川 煤 矿 建 何 登 清 王 庆 峰 2012年2月12日

1

主斜井清理斜巷作业规程

主斜井清理斜巷施工作业规程

项目经理:

编 制:

安全经理:

生产经理:

机电经理:

监理单位:

2

主斜井清理斜巷作业规程

审 批

总工程师: 安全副总: 生产副总: 通风副总: 机电副总: 基建副总: 地测副总: 调 度 室: 安 监 处: 生 产 科: 通 风 科: 机 电 科: 地 测 科: 基 建 科:

3

主斜井清理斜巷作业规程

审 批 意 见

4

主斜井清理斜巷作业规程

目 录

前言···········································7 第一章 地质概况·····································8

一 掘进巷道地质概况·································8 第二章 工程概况····································10

一 巷道布置平图································10 二.巷道概况表······································11 三.巷道拨门坐标、方位································11 第三章 巷道施工····································11

一.施工方法········································11 二.施工工序········································26 三.施工设备········································26 四.循环组织········································26

第四章 一通三防····································30

一.局部通风·······································30 二.监测监控········································32 三瓦斯防治····························33 四.防尘和防自然发火····························36

第五章 掘进供电·····································37

一.掘进工作面供电基本要求···························37 二.供电系统图······································38

第六章 生产系统与经济指标···························39

一.系统线路与说明··············································39

二.主要经济指标····································40

第七章 安全技术措施·······························41

一.施工前准备工作··································41 二.拨门管理···································42 三.爆破与爆炸材料管理·······························42 四.顶板管理········································45 五.“一通三防”管理····································47 六.机电、运输管理···································49 七.掘进防治水······································63 八.其它··································64 九.矿压观测与成巷维护································65

5

主斜井清理斜巷作业规程

十.通讯及信号系统管理································67 十一.避灾路线·······································67

第八章.其它内容·····································70

一.作业环境管理····································· 70 二.施工图牌板管理····································70 三.区队干部安全、质量包干责任制························70 四.反“三违”惩处条款·········································71 五.其它·············································72

6

主斜井清理斜巷作业规程

作业规程贯彻记录

工程名称:主斜井清理斜巷 第一班 贯彻 队干 班队 日期 签名 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 第二班 贯彻 队干 班队 日期 签名 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 第三班 贯彻 队干 班队 日期 签名 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 贯彻 队干 班队 日期 签名 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 补贯 贯彻 队干 班队 日期 签名 7

主斜井清理斜巷作业规程

19 19 19 19 19 8