云南某水景工程施工组织设计

来源:九壹网
 **园区** 水景工程

筑龙施 工 组 织 设 计

审核: 编写:

编写单位:**水利建筑机械化工程公司 编写日期:2005年4月16日

网 WWW.ZHULONG.COM 目 录

第一章 工程概述···············································································································6 1.1 工程概况····································································································································6 1.2 主要工程项目及工程量············································································································6 1.2.1 主要工程项目················································································································6 1.2.2主要工程量清单·············································································································7

2.1 施工布置原则··························································································································7 2.2 施工布置措施··························································································································8 2.3 施工道路··································································································································9 2.4 施工用电、用水······················································································································9

2.7 砂浆及砼拌和站的布置········································································································10 第三章 施工进度计划··································································································10 3.1基础开挖工期计划···················································································································10 3.2分项工程施工进度计划···········································································································11 3.3 施工进度计划保证措施········································································································12 3.3.1组织保证·······················································································································12 3.3.2技术保证·······················································································································13 3.3.3资源保证·······················································································································13 3.3.4合理安排、协调控制···································································································13 3.3.5抓质量安全,促施工进度····························································································14 3.3.6积极推广高科技应用···································································································14 第四章 施工准备···········································································································14 4.1 组织机构································································································································14 4.1.1 人员组织······················································································································15

筑龙网 WWW2.6 砂石料加工及储备场的布设··································································································9

.Z2.5 施工通讯··································································································································9

HULONG.C第二章 施工总布置··········································································································7

OM1.3 合同要求····································································································································7

4.1.2 技术措施······················································································································15 4.2 工期保证措施························································································································16 4.2.1 人员保证······················································································································16 4.2.2 机械设备保证··············································································································16 4.2.3 人员准备····················································································································16 4.3 机械设备································································································································19 4.4 物质准备································································································································19 4.5 技术准备································································································································20 4.5.1 施工组织设计··············································································································20 4.5.2 现场试验······················································································································20 4.5.3 测 量··························································································································20 4.5.4 土工模··························································································································22 第五章 分项工程施工程序及方法说明书······································································22 5.1 土石方开挖······························································································································22 5.3 浆砌石工程······························································································································23 5.3.1 施工准备······················································································································23 5.3.2 材料······························································································································24 5.3.3 水泥砂浆······················································································································24 5.3.4浆砌石砌筑···················································································································25 5.3.5砌筑体质量控制点的设制····························································································26 5.4 钢筋制作安装··························································································································28 5.4.1 钢筋的采购与制作······································································································28 5.4.2钢筋的安装···················································································································28 5.4.3钢筋验收·······················································································································29 5.5 模板工程··································································································································29 5.5.1 模板设计依据··············································································································29 5.5.2模板规划原则···············································································································30 5.6砼浇筑施工·······························································································································31 5.6.1砼浇筑准备···················································································································31 5.6.2 混凝土拌和··················································································································33 5.6.3砼输送···························································································································35 5.6.4 砼浇筑:······················································································································35 5.6.5砼浇筑注意事项···········································································································35 5.7 止水安装··································································································································36 5.8 湿地排水管制作安装············································································································36

筑龙网 WWW.ZHULONG.COM 5.9 φ500钢筋砼预制管的预制与安装······················································································37 5.10 锚筋········································································································································38 5.11土工模铺设 (含砂垫层和粘土铺筑)··················································································38 5.11.1土工膜拼接·················································································································39 5.10.1土工模铺设·················································································································40 5.11.3土工膜回填覆盖·········································································································41 5.11.4土工膜质量检查和验收:··························································································41 5.12其它项目施工·························································································································41 第六章 质量体系及保证措施···························································································42 6.1 工程质量保证措施················································································································42 6.1.1从技术上保证施工质量·······························································································42 6.1.2从管理措施上保证施工质量························································································42 6.1.3从施工工序上和检测手段上保证················································································43 6.2 主要检测项目及保证措施····································································································43 6.2.1认真落实各项管理制度,强化检测试验工作····························································43 6.2.2原材料检测···················································································································44 6.2.3砼施工检测···················································································································44 6.2.4 土石方开挖质量控制··································································································45 6.2.5 砌筑体质量控制··········································································································45 第七章 安全体系及安全保证措施··················································································47 7.1安全目标···································································································································47 7.1.1**园区**水景工程控制目标·························································································47

7.2 安全目标达标措施················································································································48 7.3 安全体系································································································································48 7.4安全保证···································································································································50 7.4.1、安全管理保证············································································································51 7.4.2、安全技术保证············································································································53 7.5安全生产责任保证···········································································································57 7.5.1项目经理责任·················································································································58 7.5.2项目总工技术责任·········································································································59 7.5.3项目安全员工作责任·····································································································60 7.5.4项目工长及施工员责任·······························································································63 7.5.5工人责任·······················································································································64

筑龙7.1.2、安全措施计划·····················································································································47

网 WWW.ZHULONG.COM 第八章 环境保护及环保措施·························································································65 8.1文明施工的主要措施···············································································································65 8.2 环境保护的主要措施············································································································66 8.2.1 环境保护管理体系····································································································66 8.2.2 环境保护基本构想及主要控制点设置·······································································66 8.2.3 防水排水······················································································································66 8.2.4 废料废方的处理··········································································································67 8.2.5保护水质·······················································································································67 8.2.6 控制扬尘····················································································································67 8.2.7减少噪声、废气污染···································································································68 8.2.8 保护树木、绿化环境··································································································68

筑龙网 WWW.ZHU

LO

NG

.C

OM 第一章 工程概述

1.1 工程概况

**水景工程**园区的一个景点,工程位于****古遗址处,整个工程由**大道引水管道;胜利水库排洪沟引水管道、布水沟和泄水槽;排洪箱涵;蓄水塘和人工湿地等组成。

水景工程充分利用**烟厂厂区以东排洪沟和胜利水库排洪沟两条沟的自然高差,采用管道接引沟道中的长流泉水和雨季部分雨水,作为水景用水水源,给水景水塘补水,保障水质。同时,应用水景周围的高差进行布水,造成水帘瀑布,在水塘底种植沉水植物,形成水景景观。

1.2 主要工程项目及工程量 1.2.1 主要工程项目 a、**大道引水工程

c、排洪箱涵及**大道路堤工程 d、左岸挡墙及回收取水口工程 e、塘底防渗及跌水坎工程 f、湿地工程

筑b、胜利水库引水工程

龙网 WWW.ZHULONG.COM 1.2.2主要工程量清单 见附表: 1.3 合同要求

(一)合同工期为日历天100天。

第二章 施工总布置

(1)、各临时设施均按照招标文件要求结合现场踏勘情况及业主提供的条件,在规定的范围内进行布置。

在满足施工要求的前提下,尽量做到简单、实用、安全可靠和经济合理。

(3)、施工场地和道路在现有基础上规划,其生产辅助设施则根据现场情况和实际需要合理规划布置。

(4)、施工布置,应充分考虑环境保护的要求,做好环境保护工作,

筑(2)、临时设施的规模根据施工总进度和施工强度的需要规划设计,

龙网 W2.1 施工布置原则

WW.ZHU

LO包人自行设计、施工、使用和竣工后拆除,恢复场地的原来面目。

NG(三)除建设单位提供的公用临时设施以外的施工临时设施,均由承

.C施工、维护和使用,完工后无偿移交建设单位。

OM(二)各工作面的施工场内公路:各工作面的施工场内公路的设计、

做到安全、文明施工。 2.2 施工布置措施

(1)、施工项目部设于该工程所在地**市,项目部房子在当地租用,并且对外交通方便,有利于对外联系和施工现场基础资料的整理。 (2)、在**园区**水景工程施工过程中,将**水景工程的开挖、回填、钢筋制作、土工膜铺设及砌筑施工划分成六个施工段,第一施工段**大道引水工程里程:0+000.000~0+372.252;第二施工段胜利水库排洪沟引水管和泄水槽工程里程:0+000.000~0+292.632;第三施工段排洪箱涵及**大道路堤工程,排洪箱涵里程:0+000.000~0+185.796;第四施工段左岸挡墙及回收取水口工程;第五施工段塘底防渗及跌水坎工程;第六施工段湿地工程;六个施工段在施工过程中均同步进行。在施工现场附近经业主方或监理单位指点选择场地平整处用石棉瓦搭建1-2间现场技术办公室,主要用于试验、质检、测量等技术办公和现场施工技术值班。

上层粘土铺筑,第二施工队承担本施工段C15砼跌水砍、钢筋制作及橡胶止水带的施工,在塘底防渗及跌水坎工程施工现场成立专门的技术组办公室,负责塘底防渗的施工技术指导和质量、安全、进度监督。 (4)、临时辅助生产设施布设于引水工程附近开阔地上,并建材料库房20 m用于堆放水泥、钢材、土工膜等材料。在施工现场合理的平

2

筑一施工队承担塘底清理、塘底找平、人工砂回填压实、土工膜铺设、

龙(3)、塘底防渗及跌水坎工程的施工任务主要由两个施工队承担,第

网 WWW.ZHULONG.COM 地上布置砂浆搅拌站或砼拌和站及钢筋加工场。 2.3 施工道路

(1)、对外交通主要采用昆玉高速公路贯通内外,承担施工中主要材料及施工设备的运输。

(2)、场内施工道路:主要采用施工现场内现有的道路和进场后在**园区**水景工程施工区域内新建的临时施工道路。 2.4 施工用电、用水

施工用电、用水由业主方提供,并在施工中配备一台20KW的柴油发电机供其它施工段的施工电源,以保证电源充足,使工程施工顺利进行。另外项目部再修建临时水池并安装临时供水设施,从发包方

2.5 施工通讯

台;在对外联系中采用移动电话进行联系,移动电话配备8~10台。 2.6 砂石料加工及储备场的布设

砂石及块石料从当地采购合格的建材,在施工现场的各施工段较平的地方布置备料地。

筑龙在施工现场采用无线对讲机进行相互联系,配备无线对讲机6

网 WWW指定的取水点取水引用。

.ZHULONG.COM 2.7 砂浆及砼拌和站的布置

在各施工段较平的合理位置请示业主方或监理单位指点布置砂浆及砼拌和站,砂浆及砼拌和站在施工过程中的设置形式为可移动式,使砂浆及砼拌和站能更好的于工程进展相吻合。

3.1基础开挖工期计划 (1)、施工准备:

2005年04月25日~2005年04月28日

(2)、第一施工段**大道引水工程里程:0+000.000~0+372.252:

2005年04月28日~2005年04月29日

(3)、第二施工段胜利水库排洪沟引水管和泄水槽工程里程0+000.000~0+292.632:

2005年04月29日~2005年04月29日

(4)、第三施工段排洪箱涵及**大道路堤工程,排洪箱涵里程:0+000.000~0+185.796:

2005年04月30日~2005年05月01日

(5)、第四施工段左岸挡墙及回收取水口工程:

2005年05月01日~2005年05月04日

(6)、第五施工段塘底防渗及跌水坎工程;

2005年05月04日~2005年05月08日

筑龙网 WWW.ZHULONG.COM第三章 施工进度计划

(7)、第六施工段湿地工程;

2005年05月08日~2005年05月10日

3.2分项工程施工进度计划

分项工程施工进度计划表

一 施工准备 1

临建及施工道路 二 基础开挖工程 1 2 3 4 5 6

2005、04、25~2005、04、28

OM 6113.00 m³ 5279.00m³ 1594.00m³ 1073.00m³ 1545.00m³ 199m³ 3588m³ 1268m³ 6760m³ 460 m³ 68 m³

项目名称 号

施工工期 工程量 备 注

三 基础回填工程 1 2 3 4 5

龙塘底防渗及跌水坎工程人工砂回填压实

筑塘底防渗及跌水坎工程上层粘土铺筑 湿地工程碎石 湿地工程河砂

四 砌筑体工程 五 钢筋制作安装工程 六 其它工程

网排洪箱涵及**大道路

2005、05、03~2005、05、08

堤工程粘土回填压实

2005、05、08~2005、05、10 2005、05、10~2005、05、20 2005、05、20~2005、06、20 2005、06、20~2005、07、20 2005、05、04~2005、07、26 2005、05、01~2005、07、23

W

胜利水库引水工程基础开挖施工

2005、04、29~2005、04、29

WW湿地工程基础开挖施工

2005、05、08~2005、05、10

.Z

排洪箱涵及**大道路

2005、04、30~2005、05、01

堤工程基础开挖施工

HU**大道引水工程基础开挖施工

2005、04、28~2005、04、29

LO塘底防渗及跌水坎工程基础找平

2005、05、04~2005、05、08

NG左岸挡墙及回收取水

2005、05、01~2005、05、04

口工程基础开挖施工

.C 分项工程施工进度计划表

序号 1 2 3 4 5 6 7

项目名称 土工膜铺设 ф500凡尔闸 ф300凡尔闸 ф100凡尔闸 拦污栅 橡胶止水 C15砼跌水坎

2005、06、18~2005、07、25 2005、05、20~2005、07、25 2005、06、12~2005、07、20 2005、05、20~2005、07、02

施工工期

2005、05、20~2005、07、27

工程量 13950.00 m²

3套 1套 2套 1道

备 注

七 ф500钢筋砼预制管 2005、06、12~2005、07、20 八 砼工程

2005、05、04~2005、07、26 2005、04、20~2005、07、25 2005、04、20~2005、07、25 2005、07、26~2005、08、03

.CNGLO2005、04、20~2005、07、25

HU九 收尾

(注:其它未尽交错施工项目,施工过程中作具体安排) 3.3 施工进度计划保证措施 3.3.1组织保证

为更快更好的完成**园区**水景工程的施工,我公司将派遣组织能力强、管理经验丰富、技术水平高的施工管理人员和能满足施工需要的施工机械,组成一支以项目经理部、施工作业队为主体的现代化水利施工队伍,保证业主确定的阶段目标和总体目标如期实现。

1、选派技术过硬、经验丰富、精通管理的管理人员组成项目经理班子;

2、推行现代管理模式;

筑龙网 WWW.ZOM368m

840 m³

3、建立健全各项管理制度、目标明确、责任分明。 3.3.2技术保证

技术保证是施工进度保证的重要前提。本工程我公司将组建一支项目经理部、下设施工作业队逐级负责的技术管理体系,配专业性强的技术服务队伍。负责承担与业主、监理、设计单位的技术交流和施工计划、施工工艺、技术指导、技术监督、科技攻关等工作。 3.3.3资源保证

1、配备足够高素质的管理人员和经验丰富的技术人员,并全面系统地对各种施工人员及服务人员进行培训,经考试或考核合格后方可上岗。从人员的质和量上满足工程施工的需要。

3.3.4合理安排、协调控制

1、优化施工工艺过程,合理安排施工工序,使其严密紧凑。在保证施工安全的前提下,合理安排施工,有效利用各施工时段,前期工作尽可能早安排、早完成,为后续施工留有余地,以确保目标工期的实现。

筑时正常的施工,以确保施工质量和施工进度计划的实施。

龙3、提前准备工程所需的设备和材料,保证工程在施工期间能及

网提高设备的完好率、出勤率和安全可靠性,保证施工顺利进行。

W施工机械设备,并准备充足的备用件。加强使用过程中的维修保养,

WW2、根据施工进度要求,配置足够数量、性能良好、相互匹配的

.ZHULONG.COM 2、生产组负责协调生产、全面分析、详细编排施工月、日进度计划,项目经理部每周召开一次生产协调会,及时解决存在的问题,制定出相应的整改计划及具体有效措施,加强协调或补充不足的施工力量,确保施工进度计划的顺利实施。

对本工程施工进度网络图中关键线路上的关键项目,如基础开

证项目施工和总工期100天的顺利实现。 3.3.5抓质量安全,促施工进度

在施工中始终狠抓工程质量,杜绝质量事故,减少工期损失;抓好安全生产,杜绝机械设备及人身安全事故,避免因事故而影响施工进度和工程质量。

3.3.6积极推广高科技应用

水平,优质高效完成工程任务。

筑用各种施工新技术、新工艺、新方法,不断提高施工技术水平和管理

4.1 组织机构

为加强项目法施工的标准化管理,落实各项工作责任制,提高项

龙施工中广泛开展技术革新活动,积极推广高科技应用,尽可能采

网第四章 施工准备

WWW.ZHULONG.C格通过控制日计划保证周计划,控制周计划保证月计划,以月计划保

OM挖、土工膜铺设、钢筋砼施工、钢筋砼预制管、污工砌体等施工,严

目管理水平,充分调动员工的积极性,确保工期、质量、安全、文明施工、环保卫生等工作达到项目工程管理预期经济目标,保证在个人职位上贯彻执行党和国家对行业管理的标准、法规、规范、规程及项目部的规章制度,狠抓施工现场的优质、安全、文明施工的标准化、制度化、规范化、科学化管理,确保**园区**水景工程创“省优工程”,

4.1.1 人员组织

我公司自进入水利施工市场以来,积累了丰富的水利施工经验,并具有雄厚的施工技术力量和配套的施工机械设备。若我公司中标承担本工程的施工任务,将组建**园区**水景工程项目部,由我公司刘文松(工程师)任项目经理,刘和平(高级工程师)任项目总工,并组织一支优秀的施工队伍、精良的施工设备投入施工。配备具有较强责任心和丰富施工经验的各单项工程施工管理人员,进行各工序的施工管理。并充分发挥全体施工人员的积极性和创造性,多提合理化建

4.1.2 技术措施

建立以项目技术负责人杨彩艳同志为核心,负责承担起与业主、监理部、设计院的日常联系和现场施工。如我公司一旦中标,由项目技术负责人根据详细的施工平面图,组织有关人员编写详细的施工组

筑(人员情况详见:拟投入本合同工作的主要人员表)

龙议,优化施工作业。

网 WWW.ZHULONG.COM创市级文明安全工地,确保不发生死亡事故。

织设计、总体网络计划,报请监理工程师批准,生产部根据批准的总体进度计划编排阶段性计划以及日、周、月进度计划,在实施前在报请监理工程师批准切实做到以日保周,以周保月,以月保整个合同工期100天的进度要求,确保工程顺利进行。 4.2 工期保证措施 4.2.1 人员保证

(人员情况详见:拟投入本合同工作的主要人员表)

合理配置、调度施工机械,使机械的使用率达到最佳,机械维修做到准确及时。

(机械设备情况详见:机械设备配备表) 4.2.3 人员准备

筑龙网 W项目经理部:项目经理、总工各一名 质检负责人:1人 试验负责人:1人 塘底防渗负责人:1人专业工程师:4~6人 测量负责人:1人 4.2.2 机械设备保证

WW地质负责人:1人 后勤负责人:1人 财务负责人:1人 材料负责人:1人 安全负责人:1人 .Z立施工班组。各施工班组设技术负责人一名,施工负责人一名,

HU试验员、测量员、财务员、安全员等分管各项工作。并在各施工段设

LO目经理,刘和平(高级工程师)任项目总工,设立地质员、质检员、

NG本工程施工组织机构如下,公司选派人员刘文松(工程师)任项

.COM 4.2.4、工期管理措施

为确保**园区**水景工程“100天工期”的顺利进行,我公司特制订了系列相关管理措施。

**水景工程的工期紧,顶目较多,有土石方开挖、砼浇筑、人工砂回填压实、粘土料填筑、土工膜铺设、预制管安装等。各项目之间

如某个环节出了问题,将直接影响整个工期。因此,为确保**水景工程的工期,我公司特制定以下措施:

(1)、实施项目法管理:实行项目经理领导下的分工负责制,做到分工明确、层层负责、落实到班组,责任到个人。

(2)、项目经理对本工程负全面责任,统一部署施工,统一思想,统一指挥,协调和解决各施工班组之间的问题。整个施工过程,严格按优化的本工程的施工组织设计及进度计划实施,按质按量确保工期,完成任务。

(3)、项目总工对工程质量、技术总负责,整个**水景工程技术质量均在其监督中。推行全面质量管理,采取有力技术措施,强化质量管理,杜绝质量事故。不因工程质量问题影响度**水景工程施工的顺利进行。

(4)、配备具有较强责任心的各单项工程的施工管理人员(预制管安装负责人;土工膜施工负责人;湿地施工负责人;开挖负责人;钢筋混凝土负责人;后勤生活负责人等等)。做到自己分管的工作,尽

筑龙网 WWW.ZHULONG.C工时场地狭窄,施工设备又较多,渗水、排水等受诸多方面影响又大,

OM穿插搭接频繁,材料和所使用机械设备各不相同,工序流程各异,施

心尽职,每天的生产任务,当天必须按计划完成,如遇特殊情况完成不了的,第二天也一定补上,严格按进度计划实施,今天的任务今天完,一切从“工期100天工期”这个大局出发,**水景工程抢的是时间,要的是质量。

(5)、充分发挥全体施工人员的积极性和创造性,施工中尽量采用

**水景工程区域内如果配置施工机械多,将形成拥挤,容纳不下,想快也快不起来。反之,少了,则完不成任务。所以,机械必须合理调度、合理安排。

(7)、要保证施工机械的完好率,由技术过硬的修理技师组成维修组。机械有故障,要突击抢修,在最短的时间修复,恢复生产,不影响100天的工期。另外,关键机械、龙头设备都考虑了一定量的备用设备。如果有机械问题,立即用备用设备补上,不影响正常作业进度。

(9)、粘土碾压质量的保证:填筑每层碾压质量的好坏,直接关系塘底防渗的安全,因此,施工人员必须有较强的质量意识,控制好含水量、铺土厚度、碾压遍数、碾迹错距等施工参数。碾压好的仓面,试验人员及时取样,得出试验数据,合格签证后,进行新填筑层的施工。不管白天晚上,**水景工程六段施工区域内都有质检、试验人员值班,不影响“100天工期”的施工。

(10)、生活服务方面:负责后勤的管理人员,搞好职工伙食,既

筑龙网 WWW.ZHULONG(6)、施工机械的合理配置、调度,是保证100天工期的重要环节。

.C加快施工进度。

OM新技术、新工艺、新材料、新机械,多提合理化建议,优化施工作业,

卫生又富营养,夜里加班,夜餐派员工送至工地,让职工有充沛的精力上班。

(11)、确保安全生产,制定分项安全操作制度,并严格执行,杜绝伤亡事故的发生。

(12)、工资奖金分配与工程的质量进度挂钩,落实奖金制度,奖

4.3 机械设备

主要施工设备配置情况说明表

挖掘机 CAT330 1台 装载机 ZL-50 1台

开采土石方料、装料、修

装砂石骨料、配合挖掘机装载土石方料

平整粘土料、砂料、弃碴

LO设备名称

型号及规

数量 作 业 面

NG.C强 度 及 说 明 最大强度923 m³/日

自行式压路机 CA25 1台 碾压回填土、人工砂

电动夯 2.1kW 8台 夯实机械压不到的地方 自卸汽车

4.4 物质准备

工程施工所需的全部建筑材料有:碎石料、砂料、块石料、石碴料、粘土回填料、水泥、土工膜、钢筋预制管、橡胶止水带、沥青、油毛毡等。施工用砂、碎石、块石、石碴料、粘土回填料等材料按就

筑(详见:机械设备表)

龙网斯太尔

20t

WWW推土机 T140 1台

运堆石料、运粘土、运砂

6辆 料、钢筋、预制管、土工

膜等原材料

.ZHUOM惩分明,对**水景工程施工有特殊贡献的人员,给予重奖。

近选用或业主指定使用的原则,对工程附近进行了工程所需的天然建筑材料地质调查, 4.5 技术准备

为满足施工进度计划和达到施工质量目标,根据**园区**水景工程施工特点,结合我公司的具体情况,投入各种设备。详见本《拟投入本合同工作的主要人员表》。

。 详见《拟投入本合同工作的机械设备表》

如我公司中标,由工程技术负责人组织人员编写施工技术设计,进场后立即提交监理部审核。 4.5.2 现场试验

(1)测量准备工作

本工程拟配专职测量人员两人,其中工程师1人,助工1人。配备TOPCON GTS311全站仪1套,T2型经纬仪1套,DS3型自动安平水准仪1套。在各个项目的测量工作开始前三天,把施测方法、设备、人员等有关情况书面呈报监理人批准后实施。

筑4.5.3 测 量

龙成果。(试验设备详见:试验设备表)

网进场准备土石方填筑的试验检验和现场生产性试验,并提交试验

WWW.ZHULO4.5.1 施工组织设计

NG.COM (2)设计控制网的复核

签订施工合同后,由承包人对监理人所移交的基准点(线)、水准点和书面资料进行复测与复核,将复核复测后的成果报监理人审批。

(3)施工控制网的设置

引水口的起始端水流方向为第一象限角,方位角0度。

**大道引水管道工程以取水口0+0+0000.000为坐标原点,取水口管道的起始端水流方向为第一象限角,方位角0度。

排洪箱涵及**大道路堤工程、左岸挡墙及回收取水口工程、塘底防渗及跌水坎工程与湿地工程的施工坐标控制网均根据需要和可能参照以上两个施工控制网。在**园区**水景工程设置闭合水准路线,埋设半永久性点,作为高程测量控制点;并绘制平面控制网和高程控制点平面位置图;将结果报监理审批后,作为工程平面控制和高程控制点。

(4)施工放样测量

①根据所设置的**园区**水景工程各施工段施工控制网进行原地貌地形测量和横断面测量,断面桩号与设计桩号保持一致,在地形复杂或特殊地带的断面需每隔10米进行加密,完毕后把测量记录成果及其所测绘的断面图报送监理人审核。**园区**水景工程清基完成后,测绘1:500**园区**水景工程清基地形图,计算清基工程量,再

筑龙网 WWW.ZHULONG.C泄水槽工程建立施工平面控制网,以引水口0+0000.000为坐标原点,

OM为了便于各单项工程施工,拟定分别对胜利水库排水沟引水管及

根据清基后**园区**水景工程地形图或断面图参照设计标准断面,计算实际填筑总工程量,同时进行地质编录,送监理人审核。

②根据施工进度情况,控制各边线、轴线(如清基、填筑边线、细部结构边线及轴线)和平面高程,在各单元工程开工前把放样结果及实地桩线交监理人审核后,该单元工程才能开工。

④工程完工后,恢复所测设各施工控制网点。把测量资料与计算成果报送监理人审核作为工程完工后交桩。 4.5.4 土工模

土工膜不允许有针眼、疵点和厚薄不均匀。土工膜以大片或卷材的货包,必须贴有标签,标明该膜的制造厂名称、制造号(或组装号)、安装号、类型、厚度、尺寸及重量。并应附的专门的装卸和使用说明书。土工合成材料运输过程中运抵工地后应妥为保存,避免日晒,防

第五章 分项工程施工程序及方法说明书

5.1 土石方开挖

在未开挖时首先实地勘察,进行对土石方填筑进行规划,使开挖

筑装卸次数。

龙止黏结成块,并应将其储存在不受损坏和方便取用的地方,尽量减小

网 WWW.ZHULONG.C并把测量记录及测绘的计算图纸交监理人审核签字。

OM在各单元工程开工前、完工后均进行阶段性的测量,进行计量,

与回填料平衡,保证填筑工程供料的连续和均衡。

开挖过程中,用全站仪时时跟踪测量,保证开挖的几何尺寸,预留开挖保护层30cm,保护层采用人工开挖,开挖出来的土石方料采用优料优用原则,不合格品运输至灵秀**网球中心填土场。回填粘土采用符合设计指标的粘土。

HULONG.C

出来必须采用木材支撑。由于本工程在雨季进行施工,考虑到天气变化及下雨情况,开挖时必须边开挖边运输。 5.3 浆砌石工程 5.3.1 施工准备

引用标准及规范规程

筑龙潜水泵或污水泵把积水抽取至排水沟内。在开挖到软基时,沟槽开挖

网分段依次进行,逐层设置临时排水沟、层层下挖。积水过多时,采用

W水沟,临时排水沟深度40cm;开挖地下水位以下的土方前,先分层、

WW采用人工及时挖出临时排水沟并降低深度引水,把地表水引入临时排

.Z在开挖基坑或沟槽时,如有地表水,防止地表水倒灌进入基坑,

OM

(1) 《砌体工程施工及验收规范》GB50203-98 (2) 《建筑工程质量检验评定标准》GBJ301-88 (3) 《施工设计技术要求及施工图纸》 5.3.2 材料

(1)砌石:砌石体的石料采自距施工现场最近的料场,砌石材质坚实新鲜,无风化剥落层和裂纹,石材表面无污垢、水锈等杂质,用于表面的石材,色泽均匀。毛石吁块状,中部厚度大于15cm。 (2)砂:砂的各项物理指标应符合施工技术要求的的规定,要求粒径为0.15~5mm,细度模数为2.5~3.0。

(3)水泥和水:水泥选用有出厂合格证并经抽检合格的材料,搅拌砂浆用水为饮用水。 5.3.3 水泥砂浆

误差控制在水泥1%、砂2%、水1%。拌和过程中保持砂料含水率的稳定性,根据其含水量的变化情况随时调整用水,以保证水灰比的准确性。

(3)砂浆的拌制采用JW250强制式灰浆拌和机拌和2~3min。局部少量的用人工拌和,先干拌三遍,再湿拌至色泽均匀使用,砂浆随拌

筑(2)水泥砂浆的拌制严格按试验确定的配料单进行配料,配料称量

龙必须通过试验确定且满足其强度和施工和易性要求。

网 (1)本标段砌石水泥砂浆标号为

WWWM7.5、抹面砂浆标号为M10,其配合比

.ZHULONG.COM 随用,间歇时间不超过半个小时。砂浆在运输过程中发生离析、析水、砌筑前应重新拌和。对已初凝的砂浆必须废弃。 5.3.4浆砌石砌筑

(1)按图纸及设计要求的尺寸,准确定位放线,边坡按设计要求坡度准确放线,并打好边坡桩,挂线施工。

(2)砌筑基础的第一皮石块应痤浆,且将大面向下。

(3)砌体应分皮卧砌,并应上下错缝,内外搭砌,不得采用外面侧立石块、中间填心的砌筑方法。

(4)毛石砌体的灰缝厚度为20~30mm,砂浆饱满,石块间较大的空隙先填塞砂浆,后用碎块石或片石嵌实,不得先摆碎石块后填砂浆或干填碎石的施工方法,石块间不应相互接触。

(5)砌石的第一层及其转角、交边及预留孔口处一律选用平整、块径大的石料;砌体砌筑时,石料先洒水湿润表面,使其充分吸水。 (6)每砌筑3~4皮为一个分层高度,每个分层高度应找平一次。

丁上下错缝,内外搭接且第一层石块应坐浆,大面朝下,杜绝采用外面侧立石块,中间填心法砌筑。砌石砂浆厚度20mm左右,砂浆饱满,石块间较大的空隙先填砂浆,再用石块或片石嵌实。

(9)在砌筑体施工过一个段落后,进行M10砂浆的防渗抹面施工,砂浆抹面要求厚度设计要求,表面平整、光滑。

筑(8)M7.5浆砌块石护坡采用铺浆法分层砌筑。砌筑时,石块二顺一

龙(7)砌筑石料按要求收坡或收台,并设置伸缩缝和排水棱体孔。

网 WWW.ZHULONG.COM (10)、在左岸挡墙施工过程中,根据实地地形约每隔10m设一道沉降缝,沉降缝根据设计要求设橡胶止水。 5.3.5砌筑体质量控制点的设制

(1)对砂浆的均匀性进行检查:定期在拌和机口出料时间的始末各取一个试样,测定其湿容重。

(2)检测砂浆抗压值:28天龄期的每200m砌体取成型试件一组3个进行试验。

3

(3)浆砌体外观检查:砌体砌筑面平整度、石块嵌挤紧密度、砌缝砂浆的饱满度、沉降缝的贯通情况。

(4)对块石砌体尺寸和位置进行检查,其允许偏差不能超出施工规范及设计要求。

网 W

筑龙WW.ZHULONG.COM 浆砌石施工工艺框图 不合格项目重做 签证 浆片 砌石 不合格项目重做 建基面清理 资料整理 不合格项目重做 测量放样 资料整理 工程师检 材质检查 不合格项目重做 块质 石量 砂质 料量 水质 泥量 HULO配合比 选择 资料整理 运 料 资料整理 不合格项目重做 审资 核料 拆料 除棚 单元质量评定 不合格项目重做 浆砌石砌体 签 砌质 砂标 各部 证 体量 浆号 位尺 不合格项目重做 清理场地 养 余运 余运 护 土走 料走 检查验收

筑龙网工程师检查 W勾 缝 伸缩 缝 WW挂调 线平 .ZNG.C 材检 质查 基土检 底质查 测复 量核 审资 核料 OM 5.4 钢筋制作安装 5.4.1 钢筋的采购与制作

钢筋工程施工遵照水利水电部颁布的《水工混凝土施工规范》SDJ207-82的规定及本工程设计图纸规定执行。

进料与保管:钢筋自购,要有出厂合格证和试验报告单,其种类、钢号、直径等均符合规定,并经检验合格(每批钢筋中,按要求取样做有关力学试验);运至现场按不同级别、牌号、规格堆放整齐、挂牌标识,并进行防潮、雨等措施。

钢筋加工:钢筋的表面要洁净无损伤,油漆污染和铁锈等在使用前清除干净,带有颗粒状或片状老锈的钢筋不得使用。钢筋加工前,对其表面进行除锈、调直等工作,再按设计要求的型号、尺寸进行下料。弯钩长度、搭接长度等均符合设计要求。钢筋加工的尺寸其允许偏差不得超过表-1和表-2的数值。钢筋加工制作时先做样件,经工程师检验合格后再下料批量生产。加工后钢筋应分别堆放、挂牌标识。 5.4.2钢筋的安装

钢筋砼保护层厚按水下结构要求取5cm,钢筋弯钩为6.25d,钢筋绑扎、安装:钢筋安装的位置、间距、保护层等均按设计施工,现场焊接。受力钢筋采用双面电弧焊搭接,长度5d,其余的用铁丝绑扎, 绑扎长度按有关规范执行。角边的连接绑扎按图纸要求施工。

筑龙网 WWW.ZHULONG.COM 表-1 圆钢筋制成箍筋,其末端弯钩长度

受 力 钢 筋 直 径(mm)

箍 筋 直 径

<25

5~8 10

75 90

28~40 90 85

表-2 加工后钢筋的允许偏差

顺 序 1 2 3 4

偏 差 名 称

受力钢筋全长净尺寸的偏差 箍筋各部分长度的偏差 钢筋弯起点位置的偏差

钢筋转角的偏差

允 许 偏 差 值(毫米或度).CNGLO钢筋绑扎完毕浇筑砼前,必须会同甲方及监理人员共同检查验收,检查的内容包括钢筋的规格、形状、尺寸、数量、间距、锚

5.5 模板工程

5.5.1 模板设计依据

1、招标文件;

2、《水利水电工程模板施工规范》DL/T5110-2000; 3、《水利水电工程施工组织设计手册》;

筑龙规定,符合要求、办理隐蔽验收签字手续后,方可浇筑砼。

网固长度、接头位置、保护层厚度等,均应符合设计要求及施工规范的

WWW.Z5.4.3钢筋验收

HUOM±10 ±5 ±20 3

4、《组合钢模板技术规范》GBJ50214-2001; 5、我公司类似工程中的设计、施工经验。 5.5.2模板规划原则 1、模板设计要求

为确保本工程的砼外观体形及表面平整度、曲面光滑度的要求,模板选用应满足设计及规范要求,模板确保具有足够的强度和刚度,制作时保证模板面板的形体质量、表面平整、光洁度和密封性。模板间拼缝紧密。模板及支架在选用材料上主要以钢材为主,辅以少量木材,尽可能采用大型整体钢模板。

模板使用方面尽可能多用定型模板及专业模板,少用散模,

不断改进施工工艺,提高砼外观质量,减少或避免进行后期修补。

2、模板工艺流程

工艺流程:模板设计、制作、预组装→测量放线→运输→组装→模板校正及复测→砼浇筑→拆模及维护。

固牢实。其制作安装允许偏差不得超过下表:

筑模板安装必须按设计图纸测量放样,做到形体符合设计规定、坚

龙3、模板制作安装

网 WWW.ZHULONG.COM 模板制作安装允许偏差表

项次 偏差名称

模板平整度 1

(1)相邻两板面高差

(2)模板面局部不平(用2m直尺检查) 2 3 4 5

结构物边线与设计线 洞(井)轴线偏差 预留孔、洞尺寸及位置 闸室部分模板安装尺寸要求

偏差允许值(mm)

±2 ±2

.CHULONG

5.6砼浇筑施工

为保证砼的整体性和抗渗性,施工方法上选则一次浇筑成型的施工方案。

5.6.1砼浇筑准备 (1)材料要求。

水泥选用业主指定的符合设计要求的普通硅酸盐水泥。水泥表号:C20砼用32.5及其以上强度等级水泥;C30砼用42.5极其以上强度等级水泥;挡墙、管垫用32.5强度等级水泥。

②骨料

骨料必须符合招标文件施工技术要求7.4.1.2骨料的规定,对进

筑 ①水泥

龙网 WWW.ZOM±10 ±5

±10

场骨料按规定分批进行复验,合格后方可使用。 ③拌制用水

拌制混凝土用水符合JGJ63《混凝土拌合用水标准》规定。 ④外加剂

外加剂符合GB8076《混凝土外加剂》规定,外加剂必须经过技

(2)砼配合比

砼配合比设计按JGJ55-2000《普通砼配合比设计规程》以及本工程砼强度等级要求进行,对坍落度的确定应考虑砼在运输过程中的损失值。

(3)质量要求

混凝土的强度应符合GB50204-2002《混凝土结构工程施工质量验收规范》的规定。

计量设备应具有法定计量部门签发的有效合格证。计量设备应能连续计量不同配合比混凝土的各种材料。

水泥、砂、石、混合材料均应以重量计,水和外加剂溶液的可按重量折算成体积计。称量的偏差不应超过以下规定:每盘计量允许偏差水泥\\混合材料±1%、砂、石±2%、水、外加剂溶液±1%,砼从搅拌机卸出到浇灌完毕的延续时间不得超过设计规定时间。 为使制备的砼拌合物达到规定的质量要求,必须以完整的质量保证体系和相应的管理制度为保障,并具备完整的档案资料。

筑龙网 WWW.ZHULONG.C《混凝土外加剂应用技术规范》的规定通过试验确定。

OM术鉴定,并具有质量证明书。其品种、掺量及水泥的适应性按GBJ50119

(4)试验及检验方法和规则

强度试验按GBJ81《普通混凝土力学性能试验方法》的有关规定进行。坍落度,砼拌合物密度的试验按GBJ80《普通混凝土拌合物性能试验方法》的有关规定进行。

评定砼质量的试件应在浇灌现场由业主、监理、施工单位三方

(5)浇灌前的验收工作

钢筋工程的隐蔽、模板工程的预检、预埋件、安装工程等相关验收项目已经完成,砼浇灌等相关准备资料签认完毕,施工缝处砼表面满足要求,模板内垃圾、木屑、刨花、泥土及粘在模板上杂物已清除干净,木模板的湿润工作已经完成,砼输送泵就位、泵管铺设完成,浇灌砼的人员、机具、保温覆盖材料、水、电等已安排就位。 (6)检查模板接缝、阴阳角平整度和支撑情况,以保证砼浇灌后的效果。

5.6.2 混凝土拌和

混凝土浇筑遵照《水工混凝土施工规范》及有关规定和设计要求进行。该工程混凝土浇筑,采用插入式振捣器6台和平板式振捣器5台振捣。

砼拌合:该工程混凝土拌和场采用开挖出的石碴料平整场地,为满足浇筑,分别在各需要浇筑的施工段设置一个拌合站。 砼拌和设

筑龙网 WWW.ZHULONG.C理和坍落度控制,发现坍落度有偏差,及时联系加以调整。

OM见证取样。为确保砼的可泵性,在整个施工过程中应加强砼的级配管

备主要包括:JDY350强制式砼拌和机两台;JQY350砂浆搅拌机3台,12马力小翻斗车2台作为场内原材料运输;场外原材料运输采用自卸汽车斯太尔20t两台,运输砂、碎石料的胶轮手推车15辆;另外配备水工砼试验设备及合格的称量设备等。

砼拌和生产流程为:砂、碎石料、水泥检验→配合比确定→砂、

并经技术总负责人审核后,方可使用;水泥采用业主指定生产厂家的产品,使用前由质检员对生产日期、合格证、标号、是否结块等项目进行检查,结果报请监理工程师审核。在砂、石料等发生变化时,事前由现场试验员取料送试验室进行试配,并提供配合比通知单。配合比一旦确定后,未经专职试验工程师同意,任何人不得改变配合比。

材料称量:在拌和场挂配合比标识牌,每盘称量,专人进行监督计量检查,水泥、粗、细骨料的偏差控制在允许范围内,每盘料均要过磅,专人操作,随时保持干净、灵敏、准确。每隔一定的时间必须进行校对。

加水搅拌:搅拌第一筒前,加水空转,使搅拌筒充分湿润。搅拌时根据不同标号的砼严格按有关要求控制搅拌时间。一般搅拌至各种材料混合均匀、颜色一致。

出筒检测:按正常搅拌时间搅拌后,经过目检,混凝土可以出筒时才能出筒,出筒后严格按试验规范、规程进行取样试验,主要现场检测坍落度、和易性等,并做好试压取样工作。

筑龙网 WWW.ZHULONG.C材料检验:砂、石料运至各拌和场地堆放,由质检员按规定检测,

OM碎石料称量→计量加水拌合→出筒检测。

5.6.3砼输送

砼浇筑采用15辆人工手推车运送,使砼的浇筑连续施工。 5.6.4 砼浇筑:

(1)砼振捣:砼入仓后采用插入式振动棒进行振捣,振捣均匀,按梅

(2)养护:砼浇筑完毕后及时采取洒水或喷雾等措施进行养护。5~7月份由于天气炎热,采用表面洒水养护,砼表面经常保持湿润,连续养护时间不少于28天。养护方法经监理工程师批准后方可执行。

为保证砼密实度,在浇捣过程中应选派经验丰富责任心强的工人负责振捣。插入式振动器的操作要做到“快插慢拔、直上直下”,在振动过程中宜将振动棒上下略有抽动,以使上下振捣均匀,每点振捣时间一般以20~30秒为宜,但应分视砼表面呈水平,不再显著下沉,不再出现泡沫,表面流出灰浆为准。每振捣完一段,应随即用铁锹推

筑5.6.5砼浇筑注意事项

龙网 WWW.Z(内部振动器的插点布置见下图)

HU避免过振产生离析。砼的振捣安排经验丰富、责任心强的人员担任。

LO振捣时间以使砼表面呈现浮浆和不再沉落为止,一般为20~30S,要

NG初凝的砼中50-100mm。大面上采用平板振动器加强振捣。每一点的

.C动棒的插入深度不得超过振动棒长度的1.25倍,并应插入下层尚未

OM花状布置快插慢拔,插点间距约为振动棒有效作用半径的1.5倍,振

平拍实,并经常用φ10~φ12钢筋插入板砼中,检查板厚是否符合要求。砼振捣均匀、密实,不得漏振。泵送砼坍落度严格控制在14-16,板面砼初凝前进行二次压实,确保质量。 5.7 止水安装

(1) 止水设施的型式、尺寸、埋设位置和材料的品种规格应符合设计要求。

(2) 金属止水片应平整、干净、无砂眼和钉孔,止水片的衔按按其厚度分别采用折叠、咬接或搭接方式,其搭接长度不得小于20mm,咬接和搭接部位必须双面焊接。

(3) 塑料止水片或橡胶止水片的安装应防止变形和斯裂。

1.5RRWW1.5R.Z0.5R1.5R1.5RHULO1.5R1.5RNG.C12OM1.5RR网1.5R50-100L行列式排列 W5R模板插入式振动器立面布置     1--新浇筑砼;2--下层已振捣但尚未初凝的砼;R--振动棒有效作用半径;L--振动棒长(5) 伸缩缝砼表面要求平整、洁净。 5.8 湿地排水管制作安装

(1)、排水管均为φ200mm(δ=9.6mm)PE管材。 (2)、花管为在φ200mmPE管材上按设计尺寸开孔制作。

筑(4) 安装好的止水片派专人保护,并进行固定。

龙1.5R梅花式排列1.>1.25L (3)、花管两端头用铁丝滤网封堵。 5.9 φ500钢筋砼预制管的预制与安装

(1) 钢筋砼预制管的购买由业主方指点在具有生产能力的厂家购买,购买的预制管钢筋混凝土管必须有生产许可证、质量合格证和质量检验报告。

(2)预制钢筋砼管材料必须符合GB/T11836-1999,砼管应为C40级且符合GB/50204-2002和GBJ107-87。预制砼管钢筋网应为冷弯且符合GB13788-92。钢筋的制作应采用自动弯曲焊接,以保证钢筋圆顺、无焊接空隙和脱落。

(3)管节堆放选择使用方便、平整、坚实的场地;堆放时必须垫稳,堆放高度应符合有关规范的规定。

(4)钢筋砼预制管安装前先进行检查并将管内外清扫干净,发现裂缝、保护层脱落、空鼓、接口掉角等问题时,必须对损坏的钢筋混凝土预制管修复,至令监理人满意为止。修复工作事先申请便得到监理

(6)管道应在沟槽地基、管基质量检查合格后安装,安装时宜自下游开始,承口朝向施工前进的方向。

(7)管节下入槽时,不得与槽下的管道相互碰撞。

(8)管道安装时,应将管节的中心及高程逐节调整正确,安装后的管节应进行复测,合格后方可进行下一工序的施工。调整时,必须垫

筑(5)起重机下管时,起重机架设的位置不得影响沟槽边坡的稳定。

龙人的批准后方能进行。

网 WWW.ZHULONG.COM 稳,两侧设撑杠,不得发生滚动。

(9)钢筋混凝土预制管采用柔性企口型接口。

(10)企口应平直,环向间隙应均匀,填料密实、饱满,表面平整,不得有裂缝现象。

(11)柔性接口采用的橡胶圈必须符合规范的有关规定,在其使用前

清除,管道内接口填缝后立即拖平。

(13)管道安装的偏差必须符合设计规定: a、轴线位置偏差不得超过15mm;

b、管道内底高程不得超过±10mm。

(14)质量控制和检查必须贯穿整个施工过程,且满足设计要求。 5.10 锚筋

胜利水库排洪沟引水管和泄水槽的锚筋采用电瓶钻钻头φ30打

打空 注浆 安装锚筋 注浆

5.11土工模铺设 (含砂垫层和粘土铺筑) 土工膜、人工砂、粘土铺设过程示意图:

龙孔,制作过程如下:

网 WWW.ZHULONG.C(12)当采用水泥砂浆填缝及抹带接口时,落入管道内的接口材料应

OM质检人员必须逐个检查,不得有割裂、破损、气泡、大飞边等缺陷。

塘底找平,平整土石方回填压实(采用推土机配合挖掘机找平、局部人工找平) 铺人工砂垫层 铺500g土工膜 粘土保护层铺筑 5.11.1土工膜拼接

(1)、土工合成材料的拼接方式及搭接长度应满足施工图纸的要求。 (2)、土工合成材料的接头施工前应先作工艺试验。若采用黏结方式,则应进行黏结剂比较、黏结后的抗拉强度、延伸率及施工工艺等试验。试验前,承包人应向监理人提交试大钢,批准后才能进行试验。试验完成后,应将试验成果和报告报送监理人审批,报告应说明选定的施工工艺相应的施工参数,经监理人批准后,才能进行施工。 (3)、拼接前必须对黏结面进行清扫,黏结面上不得有油污、灰尘。阴雨天应在雨棚下作业,以保持黏(搭)结面干燥。

(4)、土工膜的拼接接头应确保其具有可靠的防渗效果。在涂胶时,必须使其均匀布满黏结面,不过厚、不漏涂。在黏结过程中和黏结后

(5)、土工膜应剪裁整齐,保证足够的黏(搭)结宽度。当施工中出现脱空、收缩起皱及扭曲鼓包等现象时,应将其剔除后重新进行黏结。 (6)、在斜坡上搭接时,应将高处的膜搭接在低处的膜面上。 (7)、土工膜黏结好后,必须妥善保护,避免阳光直晒,以防受损。 (8)、认真作好土工膜与砼的连接接头处理,保证接头处的防渗可靠

筑缝黏结强度不低于母材的80%。

龙2h内,黏结面不得承受任何拉力,严禁黏结面发生错动。土工膜接

网 WWW.ZHULONG.COM 性和平共处防渗的整体性。 5.10.1土工模铺设

(1)、铺设基础面必须平整,不允许出现凸出或凹陷的部位,并应碾压密实。并按施工图纸要求铺设支持层。砂砾石垫层平整,不允许出现凸出及凹陷的部位,排除铺设工作范围内的所有积水。

(2)、土工合成材料与基础及支持层之间应压平贴紧,避免架空,清除气泡,以保证安全。易产生架空现象的部位,必要时在该处设水平缝。

(3)、铺设过程中,作业人员不得穿硬底鞋及带钉的鞋。不准直接在土工合成材料上卸放混凝土护坡块体,不准用带尖头的钢筋作撬动工具,严禁在土工合成材料上敲打石料和一切可能引起土工合成材料损坏的施工作业。

(4)、为防止大风吹损,在铺设期间所的土工合成材料均应用沙袋或软性重物压住,直至保护层施工完为止,当天铺设的土工合成材料应

搭接长度,做到黏结剂涂抹均匀,无漏黏。

(6)、采用土工膜或复合土工膜作防渗体时,规划好施工道路,采用倒退法施工,避免车辆、设备等跨越土工膜产生剪切现象。 (7)、对施工过程中遭受损坏的土工合成材料,及时按监理人的指示进行修理,在修理土工合成材料前,应将保护层破坏部位下不符合要

筑(5)、采用现场黏结方式进行土工合成材料的拼接,应保证有足够的

龙当天全部拼接完成。

网 WWW.ZHULONG.COM 求的料物清除干净,补充填入合格料物,并予整平。对受损的土工合成材料,应外铺一层合格的土工合成材料在破损部位之上,其各边长度应至少大于破损部位1m以上,并将两者进行拼接处理。 5.11.3土工膜回填覆盖

(1)、土工合成材料完成拼接和铺设后,及时回填覆盖,当回填覆盖层层厚大于30㎝时,采用压路机压实。

(2)、土石方回填时土石块的最大落高不得大于30㎝。为防止大石块从坡面上滚滑,我公司将架设防护网,防止石块下滑,损伤已铺设完成的土工合成材料。

5.11.4土工膜质量检查和验收:

5.12其它项目施工

水景塘底排洪箱涵及**大道路堤的施工中,钢筋砼箱涵每12m设一条沉降缝,缝内设橡胶止水带,**大道侧防渗堤施工与道路施工相协调,保证防滲体质量。

筑验收。

龙(3)、在每层土工膜被回填覆盖前,按质量检查内容进行隐蔽部位的

网(2)、拼接所用的黏结剂、焊接材料和缝合细线的抽样检验。

W性能和耐久性能进行抽样检验。

WW(1)、在每批土工膜进入现场前,对其物理性能、水力学性质、力学

.ZHULONG.COM 第六章 质量体系及保证措施

6.1 工程质量保证措施 6.1.1从技术上保证施工质量

(1)认真熟悉设计图纸、施工规范、技术规范;严格按图施工,按规范施工。

(2)认真编制施工组织设计,制定施工工艺措施,制订具体的施工工序、方法、质量标准和检验手段。

(3)搞好施工前的技术交底和施工人员技术培训

6.1.2从管理措施上保证施工质量

(1)制定全面质量管理制度和切实可行的质理管理及保证措施,奖罚要公平合理、具体,并坚持按章办事,以维护该措施的权威性和有效性,确保工作质量和工程质量。进行全员质量意识教育,开展质量讲座和质量知识竞赛等多种形式的活动,使全体员工树立质量意识,从而使讲求质量成为全体员工的自觉行动,以达到确保工程质量和加快工程进度的目的,获得好的经济效益。

筑龙网(6)对业主提供的观测控制网点进行复测,并予以良好的保护。

W和工作效率。

WW(5)搞好施工方案的优化工作和施工机械的配套,提高科学性

.Z适用、指导施工。

HU(4)重视施工方案根据现场实际情况的调整和修改,做到具体

LONG.COM (2)质检工程师及工程技术人员经常到各工程队进行施工检查,对各工程队的材料和砼试件进行检查试压;各工程队成立质量检测组,生产班组设置1名兼职质检员,负责日常的质量监督与检测工作。 (3)由质安部组织专业工程师,按照技术规范要求,对各施工段施工班组质检员组织进行上岗学习、培训。

指导施工,工程材料质量和工程质量都要符合技术规范要求。

为了保证工程质量,每个工程的开工,中间施工环节,工序的继续乃至施工方案都必须经质检人员和监理工程师批准。从施工开始贯穿于整个过程,都必须通过检查、验收。以质量检查程序和检测手段来保证工程质量。(质量检测程序见框图8—4) 6.2 主要检测项目及保证措施

6.2.1认真落实各项管理制度,强化检测试验工作

(1)建立健全检测设备管理制度,建立台帐并设专人管理,用于项目的检测试验设备数量和精度均要满足项目要求,设备定期校验,保证计量过程的精度。

(2)设备的校验必须通过技术临督部门进行,保存好校验合格证,并做标志标识。

筑龙网 WWW.ZHULO6.1.3从施工工序上和检测手段上保证

NG.C试验设备。通过试验,由资料说明施工质量和材料质量的优劣,以此

OM(4)从检测、试验设备上保证。配备工程所需的一套完整的检测、

(3)对于试模、塌落度、钢卷尺、塔尺等非标准计量器具,按非标准的检验规程进行定期自检,经自检合格方可使用,并登记造册,作好记录。 6.2.2原材料检测

(1)对所有购进原材料的出厂合格证、说明书进行验收,并登记记录。

(2)对有合格证的材料进行复检,复检合格的材料方可使用。复检不合格的材料书面通知物资部门做出标记,停止使用并限期清退出施工现场。 6.2.3砼施工检测

(3)测定砼运到现场时的温度和时间保证砼不离析和入模温度。 (4)按规定在现场制做试件,试件组数按规范进行,现场试件的强度试验报告要与砼拌合系统同批试块的试验报告相符,误差超标要查明原因。

筑要求。检查办法:随机抽样,每班不少于3次。

龙(2)检查砼的拌和时间、搅拌速度,检查砼的塌落度是否符合

网试验相符,用量是否准确。

W砂石料含水量的变化做适当调整,检查水泥、外加剂、粗骨料是否与

WW(1)砼配合比必须经监理工程师审核批准后实施,并根据现场

.ZHULONG.COM 6.2.4 土石方开挖质量控制

在土石方开挖过程中, 经常进行施工控制测量,严禁超出施工规范允许的超挖及欠挖现象发生。石方开挖时,采用预留保护层10cm开挖,在靠近基础面爆破时,采用少药量控制爆破保护基础不被扰动。 6.2.5 砌筑体质量控制

筑龙网 WWW.Z (3)砌筑体的施工严格按照设计及施工规范的要求进行组织施工。

HU位置及质量符合要求。

LO (2)在砌筑体施工过程中,经常进行测量及试验检测,保证工程的

NG格材料,保证浇筑砂浆的和易性满足规范要求。

.C (1)、严格按照砂浆的配合比配制砂浆,砌筑体使用材料必须是合

OM 质量保证体系框图

开工前检查 质量保证体系

施工后检查 施工中准备 LONG 设计文件审核制 材料出厂检验制 编制质量计划、创优规划 编制实施性施工组织设计 工艺细则、技术措施编制 开工报告审批制 .C

龙自检自验制 初验质量报告制 竣工交接质量认定制 定期质量保修回访制 网隐蔽工程检查签证制 分段工程质量评定制 分段技术交底制度 工序质量交接制度 定期质量检查评定制 质量事故报告处理制 分级岗位责任制 .ZHU WWW筑 优良率满足合同要求,合格率100% OM 质量目标创优规划 TOC领导机构 QC小组 工程质量检查员 质量评定评审 TQC成果发布 管理制度 群众活动 第七章 安全体系及安全保证措施

7.1安全目标

7.1.1**园区**水景工程控制目标 (1)死亡、重伤,人为机械事故为零; (2)轻伤频率低于3‰; (3)无有害气体及食物中毒;

(4)创建“文明、安全”工地,各项施工安全检查评分90分以上。 7.1.2、安全措施计划

时间 月 日

25 28 30 08

05月份

15 18 20 30

06月份

08 18

安 全 措 施 计 划 内 容

召集全部施工管理人员及各施工班组长对**园区**水景工程施工安全管理的建议及安全治理力度的讨论,并结合施工场内根据具体情况制订安全技术、生产、教育交底。

组织各施工管理人员及机械操作人员学习施工机械操作规程及严禁违章指挥,违章操作的教育。

组织检查各施工安全工作,对各施工班组存在的问题进行整改。 学习**园区**水景工程施工安全技术交底及预制管、土工膜等材料的运输、储存、领用、回库等相关知识。

学习行业安全特点,安全管理制度等相关知识; 砼浇筑施工安全交底,学习有关安全条例; 对架子工、砼工、钢筋工进行安全技术交底。 防火、防毒、防风、防雨、防污染检查。

组织电工、施工人员及各施工班组长对电工安全操作技术交底及施工用电的相关知识的学习。

组织检查各施工安全工作,对各施工班组存在的问题进行整改。 组织全体施工管理人员及各施工班组对一个半月来的安全生产小结,对存在的问题,尽快协商解决,采纳较好的安全管理经验。 学习有关的安全防护知识; 铺设好的土工膜防护交底会议;

防火、防毒、防风、防雨、防污染检查。

筑龙网04月份

WWW.ZHULONG.COM

28 30 18 28 05

学习有关施工要点,危险部位的检查、排除知识。

组织检查各施工安全工作,对各施工班组存在的问题进行整改 防火、防毒、防风、防雨、防污染检查

组织检查各施工安全工作,对各施工班组存在的问题进行整改 总结**园区**水景工程施工安全工作,并对各施工班组的奖惩进行兑现,制定收尾工程安全工作计划。

08月份

7.2 安全目标达标措施

1.加强项目安全生产领导,落实安全生产责任制。我公司明确工程项目经理为项目安全生产第一责任人,配备专人负责安全生产工作,并形成由各类相关人员的安全生产管理网络。使本项目的安全目标在组织上得到保证和落实。

2.加强对施工人员安全教育。人的因素是第一位的,要针对施工现场特点,对施工人员进行安全思想教育、安全知识教育、安全技能教育、安全法制教育。在思想上和人员素质上保证安全目标的落实。 3.落实各项安全生产保证措施。根据本工程的特点,切实制定和落实各个环节(例如:人员、机械、用电、消防等)安全技术措施,从措施上确保安全目标的落实。 7.3 安全体系

(1)贯彻执行“安全第一、 预防为主”和坚持“管生产必须管安全”的原则,教育现场职工树立“安全为了生产,生产必须安全”的思想,结合实际情况,制定各项规章制度,逐级成立安全生产组织以保证施工的顺利实施。

筑龙网 WWW.ZHULONG.COM (2)组织职工学习国家有关“安全操作规程”,及公司的安全手册,并督促各工种严格遵守执行,坚持做到文明施工,安全生产。按“施工组织设计”的工艺流程合理组织施工。加强安全教育,提高安全员的安全意识,严格按照安全操作规程作业,严禁违章。加强劳动保护,按规定配发和使用劳动保护用品和用具,保证职工身体健康。

权、利。项目经理部设置一名责任心强、懂专业知识、现场工作经验丰富的专职安全负责人,各专业队分别配齐安全员,每天在工地巡视检查,一旦发现隐情,立即进行整改,把事故消灭在萌芽状态。

(4)根据《施工现场临时用电安全技术规范(JGJ46—88)》要求,严格制定用电安全管理条例,电工必须持证上岗,用电设备需设置避雷装置,采用TN-S系统(三相五线制)做到二级漏电保护,定期检查及维护。施工现场用电由专业电工管理,开关、电器、配电箱等装置必须完好无损。带电导线与导线之间必须绝缘包扎;带电导线严禁搭、挂、压其它物体。

(5)易燃、易爆物品的管理使用,严格按有关规程规定执行,做好预防措施和安全警卫工作,对其运输、采购、加工、保管、使用制定一系列规章制度,并接受当地公安机关的审查和检查。

(6)工地临时道路路况较差,车辆配置较多,因此,项目部一定加强工程车辆的交通安全管理,并针对工地情况制订有关措施,复杂地段设专人指挥。教育驾驶员不能超速行驶,禁止酒后驾车,杜绝

筑龙网 WWW.ZHULONG.C(3)建立安全岗位责任制,逐级签订安全生产责任书,明确责、

OM上坝施工制定专项安全技术措施,汛期停工,汛期重点抓防汛工作。

交通事故的发生。

(7)工程机械、设备,认真按照相关的安全操作规程进行,对于危险作业面,设专人指挥运行。机械(具)操作人员必须持证上岗,实行专机专人负责,非操作人员禁止开启任何机械,现场所有施工机具应按要求设置漏电保护装置,并接地。关键的施工地段设置警示牌

染。无坍塌滑坡地带,要切实落实好防火安全措施。严格执行审批制度,不得无证动用明火。焊接作业必须严格遵守“十不烧”规定,作业场所配备现场防火监护员。施工现场配备足够的消防器材,并定期检查、维护、更换,确保其有效性。重点防火部位,如木工间、危险品库等,必须要有防火制度牌和明显的严禁烟火的标志。定期进行消防安全活动和防火检查,并做好记录,查出问题,落实专人及时限期整改。

(9)在每个主要作业区的显著位置挂设“五牌一图”(即工程概况牌、管理人员名单及监督电话牌、消防保卫牌、安全生产牌、文明施工现场平面图)。主要施工部位、作业点、危险区主要通道都必须挂有相应的安全禁令标志或告示牌。 7.4安全保证

除以上工作计划外,在日常工作中项目经理及专职安全员应随时根据施工内容,定期、不定期对各作业人员进行监督、检查,发现违

筑龙网 WWW.ZHULONG.C(8)施工现场及生活区,注意防火、防毒、防风、防雨、防污

OM等安全标志。施工机械设备要经常进行检修保养,严禁带病施工。

章作业及事故隐患及时纠正,并对事故隐患进行整改,使其消灭在萌芽状态。我公司还制定了一系列的安全管理保证、安全技术保证。 7.4.1、安全管理保证

(1)建立安全领导小组:以项目经理刘文松为组长,项目总工刘和平、专职安全员徐双平为副组长,现场施工管理人员杨彩艳、严乃考、路升权及各施工班组长为组员,组成现场安全管理领导小组,负责对安全生产的管理和检查。

(2)配备专职安全员,负责工程项目的安全工作,发现事故隐患及时监督整改。

(3)各施工段管理人员、班组长是兼职安全员,负责本作业班组工人的健康和安全,负责消除本作业的的安全隐患,对施工现场实行责任目标管理。

(4)安全组织机构图如下:

W筑龙网WW.ZHU

LONG.COM 安全组织机构图

项目经理部

各操作人员

筑龙网 W施工管理人员 WW.Z施工班组长 HU项目总工 副组长 LONG专职安全员 副组长 .C项目经理 组长 OM 7.4.2、安全技术保证

为了贯彻“安全第一、预防为主”的方针,加强安全技术,安全防护措施。“安全第一”从保护生产力的角度和高度,表明了生产范围内,安全和生产的关系,肯定了安全在生产活动中的位置和重要性;“预防为主”首先端正了对生产中不安全因素的认识、端正消除不安全因素的态度,选准消除不安全因素的时机,在安排与布置生产内容的时候,针对施工生产中可能出现的危险因素,采取措施予以消除是

(3)、能应付常见事故的现场应急处理;

(4)、能掌握安全“三宝”(安全帽、安全带、安全网)的正确使用 方法;

(5)、能正确使用本工种岗位所涉及的工具和设备;

(6)、能对工具、设备、环境以及劳动用品穿戴情况进行自查; (7)、能正确使用常用的灭火器材;

(8)、能注意劳役结合,搞好自身的劳动保护; (9)、能遵守施工现场安全纪律。

筑龙网 害的一般防护措施;

W(2)、能掌握防止高处坠落、物体打击以及机械、电器等常见事故伤

WW(1)、能掌握本工种安全技术操作规程;

.Za、施工现场上岗作业人员的安全要求:

HU的多年施工管理经验,特制定以下安全技术及防护措施。

LO标及确保施工“工期100天”顺利进行,根据本工程的特点和我公司

NG最佳选择。本着“以人为本、关爱生命”的原则,为达到安全生产目

.COM b、对各施工班组安全防护技术措施的要求: (1)、开挖安全防护措施:

施工安全技术措施的编制,在开工前进行,并经过上级部门审批,有较充分的时间作准备,保证各种安全设施的落实。在施工过程中各工程部位发生变更等情况变化,安全技术措施也应及时补充完善,并

境、气候条件等主客观条件和相应的安全法规、标准。 (2)、土石方运输时安全防护措施:

施工场内道路路面保持平整和有良好的排水设施,汽车驾驶员持证驾驶,严格遵守交通规则,严禁无证、酒后驾车。 c、施工用电安全防护措施:

**园区**水景工程施工用电的安全作业,除遵守电工作业安全规程外,重点应注意:

(1)、施工现场用电必须采用“三相五线制”供电,必须采用TN~S接零保护系统。

(2)、装设配电箱及各专用开关箱必须严格实行“一机、一闸、一漏电开关制”。

(3)、线路及接头不许有裸露,要经常检查,发现裸露及时包扎。 (4)、各种过电流保护装置,不能任意加大容量。保险熔丝禁止 使用其他金属丝作代用品。

(5)、电工人员操作时,必须带绝缘手套、穿绝缘胶鞋,当需要触及

筑龙网 WWW.ZHULONG.C安全技术措施的编制,依据相应的施工方法、劳动组织、场地环

OM做好审批手续;

导电部位时,先用测电器检查,确认无电后,方能操作,并事先将有关开关切断封锁,以防误合闸。

(6)、一切电器设备的外壳或构架,都必须按规定妥善接地。 (7)、接地是防止电气事故的重要措施。在施工区域内需要接地的器械包括:与电机连接的金属构架,配电箱外壳,风水管路,临时设施

地点。可以单独设置,也可以和电路的接地合并在一起,主要是为了防止电器设备的漏电,或带电线路碰触,这些金属管道造成触电事故。 (9)、拉闸停电进行线路检修作业时,必须在配电箱门挂上“有人操作,禁止合闸”的标志牌,必要时设专人看守。 d、钢筋、钢支撑制作安全防护措施

(1)、钢材、半成品等应按规格、品种分别堆放整齐,制作场地要平整,照明灯具必须加网罩。

(2)、钢筋加工及钢筋堆放场地必须使用保护电闸箱及控制柜,电气开关柜和焊接设备操作地面应铺设橡胶板或其他绝缘材料。 (3)、随机电源开关灵敏,漏电保互器定稳。安全防护装置必须完整有效,各部位螺栓紧固。

(4)、拉直钢筋,卡头要卡牢,地锚要结实牢固,拉筋沿线2m区域内禁止行人。

(5)、展开盘圆钢筋要一头卡牢,防止回弹,切断时要先用脚踩紧。 (6)、人工断料,工具必须牢固。掌支子和打锤要钻成斜角,注意扔

筑龙网 WWW.ZHULONG.C(8)、对于风水管路及的首尾端,以及中间适当地段设置二、三个接

OM的金属支架等。

锤区域内的人和物体。切断少于30mm的短钢筋,应用钳子夹牢,禁止用手把持,并在外侧设置防护箱笼罩。

(7)、加工,搬迁钢筋时,应防止钢筋崩、弹、甩动,造成碰伤,烫伤和触电事故。

(8)、操作人员应对配合人员的安全负责,配合人员听从操作人员的

致,人工上下传送不得在同一垂线上。钢筋堆放要分散、稳定,防止倾倒和塌落。人力搬运钢筋时,应动作一致,在起落停止和上下坡道及拐弯时,前后要相互呼应,在搬运及安装时,防止碰触电线。 e、砼工安全防护措施

(1)、作业前应先检查运输道路和工具,确认安全。

(2)、使用汽车运送时现场道路应平整,现场指挥人员应站在车辆侧面。

(3)、使用手推车运输,不得抢跑,空车让重车。倒料时应设障碍,向搅拌机料斗内倒料时,脚不得蹬在料斗上。

(4)、用手推车运料时,料量应低于车厢5~10厘米。 (5)、浇筑作业必须设专人指挥分工明确。

(6)、混凝土振捣器使用前必须由电工检查确认合格后方可使用。 (7)、在槽沟、基坑中浇筑混凝土前先检查槽帮,确认安全后方可作业。

(10)、向模板内灌注混凝土时,灌注人员应服从指挥。

筑龙网 WWW.ZHULONG.C(9)、多人合运钢筋、排水钢管及槽钢时,起、落、转、停动作要一

OM指挥。

(11)、浇筑混凝土作业时,模板仓内照明用电必须使用12V低压 f、模板安装及拆除安全防护措施

(1)、进入施工现场必须戴安全帽,安全临边作业必须系安全带。 (2)、在安装或拆除模板时,临边必须有安全人员,防止材料坠落伤人,禁止无任何防护措施拆除或安装模板。

(4)、装拆模板时,必须有稳定的登高工具或脚手架 ,厚度超过3.5m时,必须搭设脚手架;装拆模板时,携带工具袋和工具箱,不使用的工具应随手放入袋内,不得在模板或杆件,脚手架上级置工具或配件。 (5)、拆除模板时,应拆一块传输一块,不得连续拆除,严禁任意抛掷零件,杆件及模板。

(6)、拆除模板前必须有申请,经总技术负责人签字同意后可方拆除。严禁猛撬、硬砸或大面积撬落和拉倒,不得留下松动和悬挂的模板。拆除的模板应及时清除污物,修理校正损坏变形部分,严禁拖掷、撞击、脚踩、填衬等损伤模板的行为。

(7)、严禁利用模板、杆件、支撑上下,禁止抛掷任何物体。 7.5安全生产责任保证

为认真贯彻 “安全第一,预防为主”的安全生产方针,依法建立健全安全管理体系和安全生产责任制,根据“管生产必须管安全”“安全生产,人人有责”等原则,明确各级管理层,各部门及各施工

筑龙网 WWW.ZHULONG.C装其于部。

OM(3)、安装模板时,应注意防止倾覆,必须在支撑牢固后方可继续安

作业班组和施工人员的责任,保障生产者在施工作业中的安全和健康,根据有关规定,特制以下工作责任制度。 7.5.1项目经理责任

(1)、对承包项目工程生产经营过程中的安全生产负全面领导责任。 (2)、贯彻落实安全生产方针、政策,法规和各项规章制度,结合项目工程特点及施工全过程的情况,制定本项目各项安全生产管理办法、或提出要求并监督实施。

(3)、在组织项目施工时,必须本着安全工作只能加强的原则,根据工程特点确定安全工作的管理体制和人员,并明确各施工班组的安全责任制和考核指标,积极参与、指导安全管理人员的工作。 (4)、健全和完善用工管理手段,严格用工制度与管理,适时组织上岗安全教育,加强宣传安全生产教育工作。

(5)、组织落实施工组织设计中安全技术措施,并监督各施工段中安

(7)、发生事故时,要做好现场保护与抢救工作,并及时上报;组织、配合事故的调查,认真落实制定防范措施,吸取事故教训。 (8)、对各施工段加强安全文明生产管理,根据公司的奖惩制度并对其进行评定。

筑隐患,立即组织人员进行整改。

龙(6)、组织施工现场定期和不定期的安全生产检查,发现施工中安全

网全技术交底。

WWW.ZHULONG.COM 7.5.2项目总工技术责任

(1)、项目工程生产经营中的安全生产负技术责任。

(2)、贯彻落实安全生产方针、政策,严格执行安全技术规章、规程。结合本项目工程特点,主持安全技术交底和开工前的安全技术交底。 (3)、参加或组织编制施工组织设计,编制、审查施工方案时,要制定、审查安全技术措施,保证其具有可行性、针对性,并随时检查、监督、落实。

予以消除。

(7)、贯彻实施一图九表法及内业资料管理标准。确保各项安全技术措施有针对性。

(8)、参加、配合因工伤亡及重大未隧事故的调查,从技术上分析事故原因,提出防范措施和意见。

(9)、加强各施工班组的安全评定及文明施工的检查评定。

筑龙网(6)、施工中存在的安全隐患因素,从技术方面提出整改意见和建议

W引起的火灾、中毒或其新工艺实施中可能造成的事故。

WW相应的安全技术措施与安全操作工艺、要求,预防施工中因化学物品

.Z后方可实施,同时要组织上岗人员的安全技术培训、教育。认真执行

HU(5)、项目工程应用新材料、新技术、新工艺,要及时上报,经批准

LO措施并监督执行,及时解决施工中出现的问题。

NG(4)、制定技术措施计划和总施工方案的同时,制定相应的安全技术

.COM 7.5.3项目安全员工作责任 a、安全员工作责任

(1)、宣传党和国家关于安全生产的方针,劳动保护法的法规、法令,达到安全生产超前控制管理,减少和防止伤亡事故的发生。 (2)、协助有关领导组织安全活动,定期或不定期进行安全检查,坚持“二反”(即反违章作业,反违章指挥),发现重大安全隐患立即采取果断措施加以纠正。

产的先进经验,增强职工的安全意识,加强对特殊作业工种的安全管理。

(6)、参加工伤事故的调查分析,提出处理意见。按规定时间上报事故调查处理的书面报告。

(7)、完善项目安全管理制度,安全规定,安全生产责任制,新工人入厂教育,特殊工种培训考核等制度。

(8)、督促现场改善作业环境,加强各种安全防护措施,搞好安全生产的现场,增加对职工的安全知识教育,减少和防止工伤事故的发生。

筑龙网(5)、做好安全生产的宣传教育和管理工作。总结交流,推广安全生

W实。

WW措施意见,并对贯彻执行安全技术措施情况进行监督、检查,保证落

.Z(4)、参以审查施工组织设计和施工方案的讨论,提出编制安全技术

HU定具体安全措施,提高管理水平。

LO生产责任制,提供修订安全生产管理制度和各项安全规定的资料,制

NG(3)、在主管领导的指导下,协助领导制定和完善各施工班组的安全

.COM (9)、经常深入现场,掌握安全生产动态,严肃安全法规,执行奖罚规定。

(11)、做好对安全措施、安全管理的原始资料记录,收集,整理,保存,及时归档,无遗漏。

(12)、坚持原则,做到安全职责范围内的工作,做到腿勤、手勤、

定性分析,做到心中有数。

(14)、检查出的隐患和问题除口头通知有关人员外,必须发书面整改通知,规定完成整改时间,督促有关人员及时整改,做到及时反馈。 (17)、对违反安全操作和违章指挥人员进行处罚,对安全工作有成绩的个人或班组提出奖励意见。

b、安全员工作责任履行四个必须

(1) 每天用日检表反映安全问题,必须真实; (2) 对日检表查出的隐患,必须发整改通知;

(3) 超过整改时间未整改,必须按规定罚款及签发强令整改通知; (4) 发强令整改通知后仍不整改,必须发停工通知,情况报上一级领导处理。

c、安全员工作责任做到六个到位

(1) 入场进行安全生产方针、政策教育宣传到位,教育面达100%;

(2) 大风雨前后井字架、外架、外用电梯、坑边防护、外电线路

筑龙网 WWW.ZHULONG.C(13)、按照规定的安全检查表,进行逐项检查,评分,进行定量、

OM嘴勤。

检查到位;

(3) 哪里有作业工人,哪里有安全检查到位; (4) 重点部位跟踪检查到位; (5) 秉公执法奖罚到位。 d、安全员工作责任每天做好十件工作

(2)现场巡视,复查隐患整改做好安全台账,重点跟踪或协助安全经理现场检查,做好记录;

(3)按“日检表”18项要求逐条核实,交工长签发(有防护打“√”,无防护打“×”)备查;

(4)落实整改,签发整改通知、罚款通知,处罚当天不安全和违章作业行为;

(5)未遂事故调查处理,协调各分包单位安全整改;

(6) 收集安全技术交底、安全活动记录,查原始记录及班组日志;

(7) 验收安全设施及机械安全装置,施工用电实行“三宝”、“四口”、“五临边”防护;

(8) 检查责任区内材料堆放情况,并做好现场文明施工记录; (9) 参加现场生产协调会,在会上报告安全情况和文明施工情况;

(10) 做好每天资料归档工作,每天对未遂事故、工伤事故、违

筑龙网 WWW.ZHULONG.C全动态;

OM(1)上班首先安排安全员到现场检查,用“日检表”考核现场安

章行为进行处罚,真实填写安全管理工作日报。 7.5.4项目工长及施工员责任

(1)、认真执行上级有关安全生产规定,对所管辖班组(特别是施工队)的安全生产负责直接责任。

(2)、认真执行安全技术措施及安全操作规程,针对生产任务特点,向班组进行书面安全技术交底,履行签定手续,并对规程、措施、交底要求执行情况经常检查,随时纠正作业违章行为。

(3)、认真落实安全技术交底,做好班前讲话,不违章指挥、冒险蛮干,进现场戴好安全帽,高空作业系好安全带。经常检查施工队作业环境及各种设备、设施的安全状况,发现问题及时纠正解决。对重点、特殊部位施工,必须检查作业人员及安全设备、设施技术状况是否符合安全要求,严格执行安全技术交底,落实安全技术措施,并监督其执行,做到不违章指挥。

(4)、每周或不定期组织一次所辖班组学习安全操作规程,开展安全

术要组织作业工人进行安全技术培训;若在施工中发现问题,立即停止使用,并上报有关部门和领导。

(6)、发现因工伤亡或未隧事故要保护现场,立即上报。

筑(5)、对分管工程项目应用的符合审批手续的新材料,新工艺、新技

龙教育活动,接受安全员的安全监督检查,及时解决提出的问题。

网 WWW.ZHULONG.COM 7.5.5工人责任

(1)、认真学习,严格执行安全技术操作规程,模范遵守安全生产规章制度。

(2)、积极参加安全活动,认真执行安全交底,不违章作业,服从安全人员的指导。

(3)、发扬团结友爱精神,在安全生产方面做到互相帮助、互相监督,对新工人要积极传授安全生产知识,维护一切安全设施和防护用具,

 

筑龙网

W 

WW(7)、有权拒绝违章指挥或检查。

.Z

 

(6)、入施工现场要戴好安全帽,高空作业系好安全带。

HU(5)、发现因工伤亡或未隧事故,保护现场并立即上报。

LO(4)、安全作业要积极提出意见,并有权拒绝违章指令。

NG做到正确使用,不准拆改。

.COM 第八章 环境保护及环保措施

8.1文明施工的主要措施

施工现场的文明水平和整洁有序的场容场貌,是企业技术、管理水平与综合实力的体现,是对公众展示并建立企业形象的窗口。搞好

(3)加强治安防范工作,融洽与周边村庄、周边单位的关系,严防偷盗、打架闹事等违法事件的发生,教育全体施工人员遵守社会公德及社会治安管理条例。

(4)对现场管理人员和操作人员统一制作标明姓名、年龄、性别、岗位和粘有照片的胸卡;同时,对管理人员集中制作公布并标明姓名、职责、照片的岗位职责牌,以方便对现场人员的工作联系。

(5)形象宣传应有醒目的标牌设置。现场有展示企业形象的标志和企业目标追求的宣传标语。

筑龙网 W建筑拉圾或其它废物,保持场容场貌的干净整洁。

WW(2)精心筹划,做到工完料尽场地清,及时处理施工中产生的

.Z料堆放有序,各种施工机具设备布置合理,互不干扰。

HU(1)优化施工平面布置,使生活区干净,整洁、生产区各种材

LO制定如下规定,在该项目上贯彻执行。

NG有着直接不容忽视的效果,为使该项目在工程上,做到文明施工,特

.C并对促进工程质量,安全生产、减少浪费、降低消耗、增进经济效益

OM项目文明施工,不但有利建立优良的社会形象,有力地促进对外经营,

8.2 环境保护的主要措施 8.2.1 环境保护管理体系

修建景观建筑物是造福于民的好事,环境保护更是施工过程中的一件大事。在大力发展基础建设、提高国民经济水平的同时,一定要做好环境保护工作。严格贯彻执行国家有关环境保护的各种法律和法规,以及标书上的有关要求,施工项目部成立兼职的环保小组,负责此项工作的检查和落实。

对进场施工全体人员进行环保类知识教育,加强环保意识,在施工期间应防止水土流失,做好废方的处理。对于施工废水、生活污水

8.2.3 防水排水

①在施工期间始终保持工地的良好排水状态,临时设施、砂石料堆放场、土料场、碴料场修建有足够泄水断面的临时排水渠道,并与永久排水设施相连接,且不得引起淤积和冲刷。

②凡有污染的废水,修建沉淀池或积水坑进行集中处理,达标后再进行排放,防止直接流入耕地,影响农作物的生长,污染周边环境。

③**集团**水景工程5—7月份雨季施工,土石方施工应随挖、

筑龙网规划,合理布置,综合治理,化害为利。

W境造成不利影响,也不能影响农田水利设施和排灌系统,。作到统筹

WW的排除,散装散卸材料的运输等,均应采取适当措施以避免对周围环

.ZHULO8.2.2 环境保护基本构想及主要控制点设置

NG.COM 随运、随填、随压;每层表面应筑成2~3%的横坡,不得积水。 8.2.4 废料废方的处理

①清理场地的废料和土石方工程的废方处理,不得影响排灌系统及农田水利设施。严格按图纸或业主方规定所在地点灵秀**网球中心填土场堆放,施工中力求不占或少占土地,并结合改地造田进行合理堆放。

②灵秀**网球中心填土场弃料堆放应做到整齐、美观、稳定,排水畅通,不得对土堆周围的建筑物、排水及其它任何设施产生干扰或损坏。 8.2.5保护水质

不允许泥水漫侵,做好施工期环境保护. 8.2.6 控制扬尘

①对砂石料堆放场地或开挖回填等由施工作业产生的灰尘,除在场的作业人员配备必要专用劳保用品外,随时进行洒水以使灰尘公害减少至最小程度,并符合当地环保部门的有关规定。

筑③施工废水及泥浆应经适当处理后方可排入指定地点,施工场地

龙或其它措施处理后才进行排放。

网②冲洗集料或含有沉积物的操作用水,应采取过滤、沉淀池处理

W避免沉渣进入河道或溪流,污染水源。

WW①对流入河道、溪流的施工用水,达到排放标准后才进行排放,

.ZHULONG.COM ②易于引起粉尘的细料或散料应预遮盖或适当洒水。运输时应用帆布、盖套及类似物品遮盖。

③夏季施工中道路尘土飞扬地段,配备6m洒水车1辆进行洒水防尘,对于施工区域内碴料运输主干道,架设水管进行洒水防尘。 8.2.7减少噪声、废气污染

①各种临时设施和场地如堆料场、加工厂等距居民区不宜小于100m。

3

②当使用设备的工艺操作,要尽量减少噪音、废气的污染,并应遵守当地有关部门对施工的规定。 8.2.8 保护树木、绿化环境

规划使用,本着满足施工要求,不乱开路、不恣意砍伐的原则,保护好天然植被。

筑③科学合理的进行施工场地布置及土料场、碴料场、砂石料场的

龙破坏施工区段内的生态环境。

网②绿化驻地,美化周围环境,保护林区树木和绿色植被,不人为

W程中,不得任意损坏树木以及植被。

WW①除了施工需要不得不砍伐的树木外,不得乱砍乱伐。在施工过

.ZHULONG.COM